Skip to content

Phase 5: complete Pi admission integration QA #56

Description

@johnnygreco

Objective

Perform final cross-repository integration, QA, documentation/blog alignment, and head-matched independent review.

Context

Scope

  • Reassess all three branches against latest upstream without force-pushing Pi; record or resolve integration conflicts under repo rules.
  • Run full validation matrix across Research, Pi, OpenShell, docs, and relevant E2E.
  • Run the real demo from clean reset and capture sanitized output.
  • Add dated QA report and align example/blog narrative to three checkpoints, one policy, one context hash, negative controls, and residual risks.
  • Perform independent panel review of each current PR head and holistic cross-repo review; post Review Records.
  • Non-goals: package release/publish; optional Phase 2b unless separately activated.
  • Dependencies: Phases 0-4.

Acceptance Criteria

  • All required checks and real demo pass or an external blocker is precisely documented.
  • No stale names/config/comments/docs remain.
  • Each draft PR has a Review Record matching its head SHA and green CI or precisely documented delegated/local validation state.
  • Tracker final status records delivered guarantees and known limits.

Required Validation

Use the full tracker validation strategy, plus current upstream comparison and end-to-end demo.

PR Expectations

No merge or move from draft without repository policy and user direction. Any post-review commit invalidates the prior Review Record until re-reviewed.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions