Skip to content

BlendPATH v2.1

Choose a tag to compare

@benjaminkee benjaminkee released this 26 Mar 21:25
· 4 commits to main since this release
  • Dedicated hydrogen pipeline modification method
    • Builds a dedicated pure hydrogen pipeline parallel to the natural gas pipeline in a new right of way
    • Transports the targeted blend amount of hydrogen, rather than same same energy content of the original pipeline
  • Improve hydraulic model computation time to enable more complex networks
  • Composition tracking and mixing for varying composition at supply nodes
  • Compressor bypass
    • By default, allow compressor bypass is on
    • Allow DR and PL modification methods to bypass existing compressors if that option yields lower costs
    • Bypassed compressors do not incur any refurbishment, salvage, or decommissioning cost

Authors: @topolskikevin @benjaminkee @ereznicek @bcakire