Design the map side from the approved Stage 2a plan - Map scheduler design and Timer wheel design, moved out of Server core design with the plan's rulings - Owners design gains the map owners, the hand back and the second login; Gateway design locks tagged routing - Harness design gains stepped maps and the world scenarios - The handling gate by verified members (decided 2026-10-18) on Message audit design, Gateway design and Roadmap