Project information
The Project Information window holds the project's metadata plus the Calculation section with the scheduling options. The same form also acts as the project wizard for New.
- Settings (ribbon tab) → ribbon group Project → Project info.
- Settings window (gear ⚙) → General tab → Project information...
- File → Project info — a simplified variant in the Backstage, with only the metadata fields (no Calculation section).
Apply commits all changes at once; Cancel, Esc or a click outside the window discards them. Enter does the same as Apply.
- Project Name — the name in the title bar and the document tab.
- Description — free text.
- Engineer and Company — free text; stored in the IFC file.
- Start Date — the project start the calculation counts from.
- End Date — informative end of the project.
Scheduling options for this project — they are stored with the file, not the app, so they travel to other machines. If you change anything here, the schedule is recalculated automatically after Apply.
- Critical definition — Total float ≤ threshold (with Threshold (work days), default 0) or Longest path.
- Float calculation — Smallest (start/finish) (default), Start float or Finish float.
- Open-ended tasks critical — marks tasks without a successor as critical.
- Mark near-critical — ticking it reveals an extra Threshold (default 2 work days; the unit follows the Duration display, so possibly hours): tasks with little float get the "near critical" marker.
- Multiple float paths — ticking it reveals the Method (Free float (peeling) or Total float (ranking)) and Max. paths (default 10): the calculation then numbers the most important float paths.
- Lag calendar — which calendar counts a relation's lag: Predecessor (default), Successor, 24-hour or Project calendar.
How to read these results is covered in Critical path & advanced analysis.
New opens the same window as a wizard (title New project, button Create). Besides the metadata fields, the wizard contains:
- Phasing template — Empty, Residential construction or Commercial / renovation: fills the new project with a phase structure.
- Shift — only visible with hour planning enabled: Day shift (default), 2 shifts, 3 shifts or 24/7.
- Holiday set — generates the project calendar: pick a country (with region and construction holiday where applicable), No holidays, or Custom… — the latter opens the calendar dialog right after creation so you can compose the calendar by hand. See Calendar dialog.
The Calculation section is absent from the wizard; set it afterwards through one of the entrances above.
public/docs/en/ and docs/wiki/ — direct wiki edits are overwritten on the next release.
Open Planner Studio · LGPL-3.0 · part of the OpenAEC-Foundation
Open Planner Studio
Getting started
Guides
- Planning & WBS
- Relations & constraints
- Calendars & hour planning
- Resources, histogram & leveling
- Baselines & progress
- Critical path & advanced analysis
- Import/export
- Reports & printing
- Keyboard shortcuts & controls
Reference
- Task dialog
- Calendar dialog
- Resource calendar
- Leveling options
- Baseline management
- External links
- Codes & fields (structure)
- Filters
- Choosing columns
- Saving and loading layouts
- Project information
- Settings
- Managing and installing extensions
- Recovering after a crash
- Keyboard shortcut reference
Project