Skip to content

Documentation Status

Pequito edited this page Oct 12, 2026 · 1 revision

This page tracks the broad coverage of the Mystic Documentation project.

Status Levels

Status Meaning
Planned Page or section has been identified but not written
Draft Initial documentation exists and needs review or expansion
Needs verification Documentation exists but behavior should be reproduced against a named Mystic version
Verified Procedure or behavior has been tested and the environment is recorded
Version-specific Confirmed only for a named Mystic release or platform

Phase 1: Foundation

Page Status Verification Notes
Getting Started Draft Needs verification Phase 1 navigation and recommended learning path
What Is Mystic BBS? Draft Needs verification Architecture and ecosystem overview
Installing Mystic Draft Needs verification Fresh-install workflow and installer concepts
First SysOp Account Draft Needs verification Local account creation and SysOp elevation
Mystic Directory Structure Draft Needs verification Core paths and backup implications
Mystic Configuration System Draft Needs verification Configuration areas and MUTIL distinction
Starting Mystic Draft Needs verification Local mode, configuration mode, and MIS startup concepts
Backup and Upgrade Draft Needs verification Backup, upgrade, verification, and rollback workflow

FTN Networking

Area Status Notes
FTN Overview Draft Initial terminology and architecture
FTN Addressing Draft Initial zone/net/node/point/domain explanation
Echomail and Netmail Draft Initial conceptual comparison
Mystic FTN Mail Flow Draft Initial inbound/outbound processing model
BinkP Planned Dedicated page pending
EchoMail Nodes Planned Dedicated page pending
MUTIL Planned Dedicated networking/processing page pending
MIS POLL Planned Current FTN polling/transport documentation pending
Legacy FIDOPOLL Planned Historical/upgrade reference only
AreaFix Planned Dedicated page pending
FileFix Planned Dedicated page pending
TIC / File Echoes Planned Dedicated page pending
FTN Troubleshooting Planned Diagnostic workflow pending

Future Core Documentation

Area Status Notes
Message Bases Planned Phase 2
File Bases Planned Phase 2
Menus and Themes Planned Phase 2
Users and Security Planned Phase 2
Network Services Planned Phase 2/3
Administration Planned Phase 3
Events and Semaphores Planned Phase 3
General Troubleshooting Planned Phase 3

Verification Policy

When documenting version-sensitive behavior, record the Mystic version and operating system used for testing whenever possible.

Do not mark a procedure Verified simply because the configuration appears plausible. Verification should include the expected runtime result.

A page may remain Draft while also stating that specific procedures still Need verification. Once a procedure has been reproduced, record the environment used and update the status accordingly.

Clone this wiki locally