Skip to content

v0.4.0 — phase-2 live extensions + deck refresh

Choose a tag to compare

@konih konih released this 17 Jul 14:09
91443fd

Phase-2 live extensions + deck refresh. The gridscale delivery is now proven live end-to-end on
real infrastructure (ephemeral create→verify→destroy, tenant clean after each): the E6g Website
Crossplane composition
provisions a real gridscale nginx VM serving /legacy + /metrics on a
public IP; the E13 Marketplace register+import works for both Caddy and nginx engines; and the
E8b GSK substrate (cluster + network + object-storage anchor) provisions cleanly. The E12c deck
refresh
reframes the interview deck around landed gridscale value (the provider + 3 upstream bug-fix
PRs) with a gate-exempt appendix and a hybrid workshop visual identity. Audit verdict: READY.

Features

  • deck: E12c-S01 appendix-exempt gates + raised main budget
  • deck: E12c-S02 gridscale value hero + Crossplane-as-IaC
  • deck: E12c-S03 agentic-workflow beat (epic -> plan -> story -> test)
  • deck: E12c-S04 appendix — NixOS path, repo-tree, quickstart, solved-different-ways
  • deck: E12c-S05 hybrid k8s-workshop styling port (ADR-0112)
  • deck: E12c-S06 wire recorded-surface fallback slots to guide names
  • deck: E12c-S07 Kaddy README badge row

Fixes

  • deck: E12c-S05 theme-tokens.sh — drop backticks in fail message
  • e6g: Live-prove Website composition VM + fix real defects
  • e6g: Migrate in-cluster Website claim to v2 selector + tighten gate

Tests

  • e13: Live-prove S02 Marketplace register+import (both engines)
  • e6g: Init v1_sel guard var (tech-review F4)

Documentation

  • inbox: Session close — phase-2 live-proof cycle + operator answers
  • adr: ADR-0303 + E14 — Phase 3 Nix golden images (forward-looking)
  • e12c: Ratify design-lane spec + admit E12c/D-038 to backlog
  • roadmap: Complete E12c backlog rows (S05-S07,S09)
  • hygiene: E12c-S09 rename HIRING_EXERCISE, fix broken E14 links
  • hygiene: E12c-S09 complete — commit the README+ROADMAP link fixes
  • coord: Log E6g/E13-S02 live proofs + deck merge + review outcomes
  • DOC-10: Drop stale 15/15 GitOps-apps count + fix its guard
  • e8b: GSK substrate live-proven; app-layer egress-blocked (decide-and-log)