Repository navigation
Releases: Projetxana/gate-authority-network
Releases · Projetxana/gate-authority-network
Release list
GATE Stage 16 — Public Baseline
GATE Stage 16 — Public Baseline
Stage 16 establishes the reproducible public baseline for the GATE Authority Verification Network Developer Preview.
Included
- Live cross-domain authority revocation
- Alternate-path preservation
- Bounded consistency with explicit freshness semantics
- Strict fail-closed verification
- Federated issuer trust
- Regional replicas
- Authority verification at effect boundaries
- MCP integration
- HTTP integration
- x402 integration
- AuthZEN integration
- A2A integration
- AP2 integration
- SSF / CAEP integration
Stage 16 reproducibility
The Stage 16 validator verifies:
- architecture contracts
- portable runtime configuration
- pinned PostgreSQL major version
- explicit Edge Function authentication configuration
- canonical migration history
- portable SSF worker scheduling
- absence of obvious committed runtime secrets
- Network v1 semantic contracts
- isolation of mutable integration-test state
Validation
- Stage 16 reproducibility invariants: PASS
- JavaScript syntax validation: PASS
- Test suite: 59 / 59 PASS
- Package dry runs: PASS
- Repository customer state unchanged during distributed integration tests: PASS
- Vercel deployment status: SUCCESS
Baseline commit
ca3cf4ee1004aabf22819b4e5e247cbc31235b4b
This release is a Developer Preview baseline and should not be interpreted as a stable production API guarantee.