Expand Up @@ -1527,44 +1527,26 @@ The **Assignment Problem** aims to allocate *n* tasks to *n* agents (machines, w

### [**Step 2](): Subtract Column Minimums**

#### Subtract the minimum value in each column from all elements in that column]().
### Problem Recap

- Col 1 min: 0 → [0, 0, 3]
- Col 2 min: 0 → [2, 2, 0]
- Col 3 min: 1 → [0, 0, 1]

<br>

#### [**Matrix after column subtraction:**]()

| | M1 | M2 | M3 |
|---------|----|----|----|
| Task 1 | 0 | 2 | 0 |
| Task 2 | 0 | 2 | 0 |
| Task 3 | 3 | 0 | 1 |

<br>

### [**Step 3](): Assignment (Cover Zeros)**

- Cover all zeros using the minimum number of lines (rows or columns).
- Assign tasks to machines where possible (one zero per row/column).

**Optimal Assignment:**
- Task 1 → Machine 1 (cost 2)
- Task 2 → Machine 3 (cost 2)
- Task 3 → Machine 2 (cost 2)
- **3 tasks** must be assigned to **3 machines**.
- Each task can be done by any machine, but with different costs.
- Each task must be assigned to exactly one machine, and each machine to exactly one task.
- **Goal:** Minimize total assignment cost.

### Cost Table

### ***Total Minimum Cost = [2 + 2 + 2 = 6]()***

<br>
| | Machine 1 | Machine 2 | Machine 3 |
|---------|-----------|-----------|-----------|
| Task 1 | 2 | 4 | 3 |
| Task 2 | 1 | 3 | 2 |
| Task 3 | 5 | 2 | 4 |

## 2. Excel Solver Step-by-Step
---

### **A. Excel Table Setup**
## Step 1: Set Up the Excel Spreadsheet

#### 1. **Cost Table (A1:D4)**
### 1. Enter the Cost Matrix

| | B | C | D |
|-----|------|------|------|
Expand All @@ -1573,7 +1555,9 @@ The **Assignment Problem** aims to allocate *n* tasks to *n* agents (machines, w
| T2 | 1 | 3 | 2 |
| T3 | 5 | 2 | 4 |

#### 2. **Decision Variables Table (F1:I4)**
- Place this table in cells **B2:D4**.

### 2. Create the Decision Variable Table

| | G | H | I |
|-----|------|------|------|
Expand All @@ -1582,42 +1566,98 @@ The **Assignment Problem** aims to allocate *n* tasks to *n* agents (machines, w
| T2 | x21 | x22 | x23 |
| T3 | x31 | x32 | x33 |

Each cell is 0 or 1 (to be filled by Solver).
- Place this table in **G2:I4**.
- These cells will be filled with 0 or 1 by the Solver (1 = assigned, 0 = not assigned).

<br>
### 3. Calculate the Total Cost

#### 3. **Objective Function (K2)**
In cell **K2**, enter:


```
```bash
=SUMPRODUCT(B2:D4, G2:I4)
```

#### 4. **Row Constraints (One task per machine)**
This formula multiplies each assignment by its cost and sums the total.

- J2: `=SUM(G2:I2)` (should be 1)
- J3: `=SUM(G3:I3)` (should be 1)
- J4: `=SUM(G4:I4)` (should be 1)
### 4. Add Row and Column Sums for Constraints

<br>
#### Row Sums (Each Task Assigned Once)

#### 5. **Column Constraints (One machine per task)**
- In **J2**: `=SUM(G2:I2)`
- In **J3**: `=SUM(G3:I3)`
- In **J4**: `=SUM(G4:I4)`

#### Column Sums (Each Machine Assigned Once)

- In **G5**: `=SUM(G2:G4)`
- In **H5**: `=SUM(H2:H4)`
- In **I5**: `=SUM(I2:I4)`

---

## Step 2: Configure Excel Solver

1. **Go to**: Data > Solver
2. **Set Objective**:
- Set **K2** (total cost) to **Minimize**.
3. **By Changing Variable Cells**:
- Select **G2:I4**.
4. **Add Constraints**:
- **J2:J4 = 1** (each task assigned once)
- **G5:I5 = 1** (each machine assigned once)
- **G2:I4 = binary** (only 0 or 1 allowed)
5. **Choose Solving Method**:
- Use "Simplex LP" or "GRG Nonlinear" (either works for this size).
6. **Click Solve**.

---

## Step 3: Solution Example

After running Solver, you should get a solution like:

| | M1 | M2 | M3 | Row Sum |
|-----|----|----|----|---------|
| T1 | 1 | 0 | 0 | 1 |
| T2 | 0 | 0 | 1 | 1 |
| T3 | 0 | 1 | 0 | 1 |
|Col Sum| 1| 1 | 1 | |

- **Task 1 → Machine 1** (cost 2)
- **Task 2 → Machine 3** (cost 2)
- **Task 3 → Machine 2** (cost 2)

**Total minimum cost:** 6

---

## Excel Table and Formula Summary

| | M1 | M2 | M3 | Row Sum |
|-----|------|------|------|---------|
| T1 | G2 | H2 | I2 | J2 |
| T2 | G3 | H3 | I3 | J3 |
| T3 | G4 | H4 | I4 | J4 |
|Col Sum|G5 | H5 | I5 | |

- **Total Cost:** `=SUMPRODUCT(B2:D4, G2:I4)`
- **Row Sums:** `=SUM(G2:I2)`, etc.
- **Column Sums:** `=SUM(G2:G4)`, etc.

---

## Result (in English)

**The optimal assignment is:**
- Task 1 to Machine 1 (cost 2)
- Task 2 to Machine 3 (cost 2)
- Task 3 to Machine 2 (cost 2)

**Total minimum cost:** 6

- G5: `=SUM(G2:G4)` (should be 1)
- H5: `=SUM(H2:H4)` (should be 1)
- I5: `=SUM(I2:I4)` (should be 1)

<br>

### **B. Solver Configuration**

- **Set Objective:** K2 (Minimize)
- **By Changing Variables:** G2:I4
- **Add Constraints:**
- J2:J4 = 1
- G5:I5 = 1
- G2:I4 = binary