Skip to content

Lock file maintenance#802

Merged
redhat-qe-bot merged 1 commit into
mainfrom
renovate/lock-file-maintenance
May 26, 2025
Merged

Lock file maintenance#802
redhat-qe-bot merged 1 commit into
mainfrom
renovate/lock-file-maintenance

Conversation

@renovate
Copy link
Copy Markdown
Contributor

@renovate renovate Bot commented May 26, 2025

This PR contains the following updates:

Update Change
lockFileMaintenance All locks refreshed

🔧 This Pull Request updates lock files to use the latest dependency versions.


Configuration

📅 Schedule: Branch creation - Between 12:00 AM and 03:59 AM, only on Monday ( * 0-3 * * 1 ) (UTC), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@redhat-qe-bot
Copy link
Copy Markdown
Collaborator

Report bugs in Issues

The following are automatically added:

  • Add reviewers from OWNER file (in the root of the repository) under reviewers section.
  • Set PR size label.
  • New issue is created for the PR. (Closed when PR is merged/closed)
  • Run pre-commit if .pre-commit-config.yaml exists in the repo.

Available user actions:

  • To mark PR as WIP comment /wip to the PR, To remove it from the PR comment /wip cancel to the PR.
  • To block merging of PR comment /hold, To un-block merging of PR comment /hold cancel.
  • To mark PR as verified comment /verified to the PR, to un-verify comment /verified cancel to the PR.
    verified label removed on each new commit push.
  • To cherry pick a merged PR comment /cherry-pick <target branch to cherry-pick to> in the PR.
    • Multiple target branches can be cherry-picked, separated by spaces. (/cherry-pick branch1 branch2)
    • Cherry-pick will be started when PR is merged
  • To build and push container image command /build-and-push-container in the PR (tag will be the PR number).
    • You can add extra args to the Podman build command
      • Example: /build-and-push-container --build-arg OPENSHIFT_PYTHON_WRAPPER_COMMIT=<commit_hash>
  • To add a label by comment use /<label name>, to remove, use /<label name> cancel
  • To assign reviewers based on OWNERS file use /assign-reviewers
  • To check if PR can be merged use /check-can-merge
  • to assign reviewer to PR use /assign-reviewer @<reviewer>

PR will be approved when the following conditions are met:

  • /approve from one of the approvers.
  • Minimum number of required /lgtm (0) is met.
Approvers and Reviewers
  • Approvers:

    • myakove
    • rnetser
  • Reviewers:

    • myakove
    • omrirh
    • rnetser
Supported /retest check runs
  • /retest tox: Retest tox
  • /retest build-container: Retest build-container
  • /retest python-module-install: Retest python-module-install
  • /retest all: Retest all
Supported labels
  • hold
  • verified
  • wip
  • lgtm
  • approve

@rnetser
Copy link
Copy Markdown
Collaborator

rnetser commented May 26, 2025

/approve

@redhat-qe-bot redhat-qe-bot merged commit 5ef9040 into main May 26, 2025
6 checks passed
@redhat-qe-bot redhat-qe-bot deleted the renovate/lock-file-maintenance branch May 26, 2025 06:10
@redhat-qe-bot1
Copy link
Copy Markdown

New container for quay.io/redhat_msi/openshift-cli-installer:latest published

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants