Skip to content

Kern 0.2.3

Latest

Choose a tag to compare

@ChristianRelf ChristianRelf released this 19 Oct 02:27

What's new

Tasks that run from their start date to their due date

  • A task with a start date is drawn as one bar across the calendar, covering every day from the day it starts to the day it's due.
  • Dragging a bar moves the whole run. Pick it up on any of its days and its length and its start date come with it, instead of the due date jumping behind the start.
  • A run that reaches across a whole month now shows on that month, even when neither end of it falls inside the view.

Copying tasks into another project

  • Copy to project on a task, or on a multi-selection, copies it into another project and leaves the original where it is.
  • The checklist comes too, along with labels, dates and the estimate. The board column and the milestone stay behind, because the other project has its own.
  • Undo removes the copies.

Who wrote a task

  • In a Kern Cloud workspace, a task row ends with the picture of the person who created it, at the far right.
  • Turn it off under Settings → Appearance → Tasks, or for one view from its display menu.

Notes at the full width of the pane

  • Wide lets a note run the whole width of the editor, for tables, wide code and pasted output that a measured column breaks into pieces.
  • The toggle is in the note's own toolbar; the default for every note is in Settings → Interaction → Writing.

Fixes

  • Task circles are one tone again. Priority reads as the weight of the ring rather than its colour, so a list of tasks no longer looks mottled between white, off-white and grey.
  • The drag handle on a task row is much easier to grab. It now reaches the full height of the row rather than sitting in a 14-pixel strip, so reordering doesn't need aiming.

Install

Windows: download Kern_0.2.3_x64-setup.exe. Existing installs update themselves.

This release is Windows only; Linux builds stay on 0.2.0.