Skip to content

Cluster-2 additional hotfixes/changes#348

Merged
arenaconspiracy merged 3 commits into
RonRonstation:masterfrom
Freelanci:cluster-2-rework
Aug 15, 2025
Merged

Cluster-2 additional hotfixes/changes#348
arenaconspiracy merged 3 commits into
RonRonstation:masterfrom
Freelanci:cluster-2-rework

Conversation

@Freelanci
Copy link
Copy Markdown

Cluster-2 additional hotfixes/changes

About the PR

Follow-up changes/fixes to the cluster-2 rework. See changelog for full list of changes

Media

Hydroponics with front desks and a bio generator.
image

Trit output pipes have been moved to the southern face of the chamber, easier for people to place down radiators on.
image

Cryo pod setup changed so the pod is no longer next to a wall.
image

Requirements

Changelog

🆑

  • tweak: Moved gravity generator APC to an internal position so it cannot be taken out by the smallest of space debris.
  • tweak: All external-facing airlock pairs have been made resistant to the effects of GreyTide virus events. This should prevent large-scale spacing when certain departments are hit by the virus.
  • tweak: An opened air canister has been added to the kitchen freezer, which should prevent the rooms pressure from dropping too low as the air cools.
  • tweak: Hydroponics now has a front desk, as well as a biogenerator on roundstart.
  • tweak: Outlet pipes for the trit burn chamber have been moved to the southern face of the chamber. This should give people more space to work with in terms of installing radiators.
  • fix: Fixed permissions on a maints door attached to the engineering department; non-engineers could enter the department through it.

…ernal-facing airlock pairs and cryo pods. See PR changelog.
@github-actions github-actions Bot added S: Untriaged Status: Needs appropriate labels. S: Needs Review Status: This PR requires new reviews before it can be merged. size/XL Changes: No C# changes: Might require no knowledge of C#. Changes: Map Changes: Might require knowledge of mapping. labels Aug 13, 2025
@arenaconspiracy arenaconspiracy self-requested a review August 13, 2025 21:24
@arenaconspiracy
Copy link
Copy Markdown

I'mn beed to sleep.
image
👎

@arenaconspiracy
Copy link
Copy Markdown

I will make a proper review tomorrow, actually playing it for myself; but that injection pipe doesn't need to be that long, like at all.

@Freelanci
Copy link
Copy Markdown
Author

Good point, I don't know why I did that

@arenaconspiracy
Copy link
Copy Markdown

Gravity APC is beneath a poster.
Cryonics could have a rollerbed by the tube or something (optional).
Otherwise this is fine.

@arenaconspiracy
Copy link
Copy Markdown

Could, maybe should update the media in the PR description. Then again, who's going to look at it after it's merged.

@arenaconspiracy arenaconspiracy added P2: Raised Priority: Item has raised priority, requiring more maintainer attention. A: Mapping Area: Maps, or tools used for mapping. and removed S: Untriaged Status: Needs appropriate labels. labels Aug 15, 2025
Copy link
Copy Markdown

@arenaconspiracy arenaconspiracy left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Yeah that checks out.

@arenaconspiracy
Copy link
Copy Markdown

I fucking forgot to merge this.

@arenaconspiracy arenaconspiracy merged commit 7ee16a3 into RonRonstation:master Aug 15, 2025
13 checks passed
@Freelanci Freelanci deleted the cluster-2-rework branch August 26, 2025 00:59
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

A: Mapping Area: Maps, or tools used for mapping. Changes: Map Changes: Might require knowledge of mapping. Changes: No C# changes: Might require no knowledge of C#. P2: Raised Priority: Item has raised priority, requiring more maintainer attention. S: Needs Review Status: This PR requires new reviews before it can be merged. size/XL

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants