docs(guide): Fase B1+B4 — hoja de ruta por capacidades + tier E2E-real#64
Merged
Conversation
…ng tier B1 — 09-Referencia/02-hoja-de-ruta.md rewritten from scratch: - Milestones by demonstrable capability (M0-M6 ladder w/ acceptance criteria); version tags become consequences, never the milestone itself. - Three hard rules: no capability milestone closes against mock; verification script written at milestone open; 1-3 week cuts. - v0.2.0-beta as two epics (distributable + restore crate delimitation per ADR-2026-07-04-001); v1.0.0 (multi-desktop w/ per-platform auth principle, multi-provider, i18n); post-1.0 horizon. - Telemetry Google Cloud backend NOT carried over (ADR-2026-07-04-002). - ## Historial section maps every old phase (0-10) to its new destination. B4 — 06-Testing/01-estrategia-testing.md: - New section 3 'El Tier E2E-real (gate de milestones)': real test account, #[ignore] tests + operator scripts, no CI (T101 pattern); anti-mock rule; privacy-promise verification criterion (zero non-provider egress). - Fixed broken relative ref to TRACE-risks-mitigations.md (../ -> ../../; file verified to exist at repo root .straymark/). AILOG-2026-07-04-002. straymark validate: 0 errors. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Qué es
Primer bloque de la Fase B del plan de actualización de la guía canónica (
new-guide/08-plan-actualizacion-guia.md). Es el PR que vuelve oficial el replanteo dentro delnxdrive-guide/.B1 —
09-Referencia/02-hoja-de-ruta.md(reescritura completa)v0.1.0-alpha.1.## Historialcon el mapa fase-vieja (0–10) → destino-nuevo, para que las referencias cruzadas de la guía no queden huérfanas mientras avanza la Fase B.B4 —
06-Testing/01-estrategia-testing.md#[ignore]+ guiones de operador, sin CI (mismo patrón que el gate FUSE real-mount T101).TRACE-risks-mitigations.md(../→../../; el archivo sí existe en la raíz del repo — verificado antes de corregir).Gobernanza
.straymark/07-ai-audit/agent-logs/guide/AILOG-2026-07-04-002-fase-b-hoja-de-ruta-testing.mdstraymark validate: 0 errores (87 documentos). Registro de follow-ups en sync (sin emergentes).Siguiente bloque (tras merge)
B5+B6+B3 — telemetría (reescritura interna-only), auditoría (relación puerto/crate) y lista canónica de crates.
🤖 Generated with Claude Code