Skip to content

V33 Gate 1: Interface Roadmap And Spec Opening#66

Merged
geraldarthurdavis merged 1 commit into
version/v33from
v33/gate-1-interface-roadmap-opening
May 22, 2026
Merged

V33 Gate 1: Interface Roadmap And Spec Opening#66
geraldarthurdavis merged 1 commit into
version/v33from
v33/gate-1-interface-roadmap-opening

Conversation

@geraldarthurdavis

Copy link
Copy Markdown
Contributor

Closure

  • Gate: V33 Gate 1: Interface Roadmap And Spec Opening
  • Acceptance criteria closed: opened the V33 SPEC/DELTA/NOTES/PARITY family over active V32 canon; refreshed SPECIFICATIONS_ROADMAP, README, package docs, PR template, and canon posture docs for V32 active / V33 draft; wired check:v33-gate1 and gate-quality workflow validation; kept V32 promotion-readiness checks green after roadmap advancement.

Tests/checks run

  • node scripts/check-bitcode-spec-family.mjs --version V33 --mode draft --current-target V32
  • node scripts/check-bitcode-canon-posture-drift.mjs --active-canon V32 --draft-target V33
  • node scripts/check-bitcode-canonical-inputs.mjs --current-target V32
  • node scripts/check-v32-gate10-promotion-readiness.mjs --promotion-mode --skip-branch-check
  • pnpm run check:v33-gate1
  • node scripts/run-bitcode-spec-quality.mjs --mode strict-version --version V33
  • pnpm --filter @bitcode/protocol test
  • npm --prefix protocol-demonstration test
  • git diff --check
  • staged diff scan for real secret-shaped OpenAI/Supabase/GitHub token patterns

Accepted boundaries

  • V33 Gate 1 is specification, roadmap, and validation opening only.
  • Interface implementation remains scoped to later V33 gates.
  • V34 deployment depth, V35 telemetry/documentation breadth, V36 Exchange, V37 website Conversations, bridge chain-of-record work, and production-mainnet value-bearing launch remain deferred.

Open the V33 specification family over active V32 canon, refresh the roadmap and contributor docs for V32 active / V33 draft posture, and wire the first V33 gate checker into package scripts and gate-quality workflow.

Also keeps V32 promotion-readiness validation green after promotion by allowing the roadmap to advance to V33 Gate 1 while preserving V32 evidence checks.
@vercel

vercel Bot commented May 22, 2026

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
engi-uapi Ready Ready Preview, Comment May 22, 2026 2:23pm

@geraldarthurdavis
geraldarthurdavis merged commit d6ebf12 into version/v33 May 22, 2026
29 checks passed
@geraldarthurdavis
geraldarthurdavis deleted the v33/gate-1-interface-roadmap-opening branch May 22, 2026 14:40
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant