Skip to content

002 stabilize framework (#15) - #16

Merged
dgtalbug merged 1 commit into
mainfrom
develop
Jan 10, 2026
Merged

002 stabilize framework (#15)#16
dgtalbug merged 1 commit into
mainfrom
develop

Conversation

@dgtalbug

Copy link
Copy Markdown
Contributor

Description

This PR implements feature #2: 002-stabilize-framework

Type of Change

  • 🐳 Docker/Container changes
  • 🔧 Infrastructure configuration
  • 📦 New service or component
  • 🔒 Security improvement
  • 📚 Documentation update
  • 🧪 Validation/Testing scripts
  • ⚡ Performance optimization
  • 🐛 Bug fix

Related Issue

Relates to feature #2 - 002-stabilize-framework

Changes Made

Implementation Summary

Metric Value
Tasks Completed 80 of 90
Phases 9
Files Changed 108
Dockerfiles Modified 3
Scripts Added/Modified 12
Documentation Files 49

Completed Work by Phase

  • Phase 1: Setup (Project Infrastructure)
  • Phase 2: Foundational (Blocking Prerequisites)
  • Phase 3: User Story 1 - Infrastructure Developer Onboards Successfully (Priority: P1) 🎯 MVP
  • Phase 4: User Story 2 - Platform Operator Maintains Secure Container Images (Priority: P1)
  • Phase 5: User Story 3 - DevOps Engineer Understands Image Relationships (Priority: P1)
  • Phase 6: User Story 4 - Developer Builds Services Efficiently (Priority: P2)
  • Phase 7: User Story 5 - Documentation Stays Synchronized with Code (Priority: P2)
  • Phase 8: User Story 6 - Platform Architect Plans Future Services (Priority: P3)
  • Phase 9: Polish & Cross-Cutting Concerns

Files Changed Summary

108 files changed
+21220 insertions
-614 deletions

By Category

Category Count
Dockerfiles 3
Docker Compose 4
Shell Scripts 12
Documentation 49
YAML Configs 11

Testing

  • Docker builds complete successfully
  • Compose stack starts without errors
  • Health checks pass for all services
  • Validation scripts run successfully
  • Documentation is accurate

Validation Commands

# Build base images
make build-base-images

# Run validation suite
./scripts/validate/validate-all.sh

# Test Docker Compose
make up-dev && make health

Checklist

Code Quality

  • Shell scripts pass shellcheck
  • Dockerfiles pass hadolint
  • YAML files are valid
  • No secrets committed

Documentation

  • README files updated where needed
  • SERVICE.MD updated if services changed
  • Architecture docs updated if structure changed

Security

  • No credentials in code
  • Docker images use non-root users
  • Base images use pinned versions

Infrastructure Notes

Breaking Changes

  • None

Migration Steps

  1. Pull latest changes
  2. Run make build to rebuild images
  3. Run make up-dev to start services

Rollback Procedure

  1. make down
  2. git checkout main
  3. make up-dev

Ready for Review

Branch: 002-stabilize-framework
Base: main
Spec Directory: specs/002-stabilize-framework
Generated: 2026-01-11 02:03:29


Generated by A.R.C. Platform PR Generator

* feat(002): Phase 1 and 2 infrastructure setup

Tasks: T001, T002, T003, T004, T005, T006, T007, T010, T011, T012, T014

Files: 12 changed

* feat(002): Phase 2

Tasks: T015, T016, T017, T018, T019, T020, T021, T022, T023

Files: 0
0 changed

* refactor: standardize documentation file names and paths

* feat(002): Phase 4 Complete - Security Infrastructure

Tasks: T024, T025, T026, T027, T028, T029, T030, T031, T032, T033

Phase: Phase 4: User Story 2 - Platform Operator Maintains Secure Container Images

Files: 0
0 changed

* feat(002): Phase 5 Complete: User Story 3 - DevOps Engineer Understands Image Relationships

Tasks: T034, T035, T036, T037, T038, T039, T040, T041

Phase: Phase 5: User Story 3 - DevOps Engineer Understands Image Relationships

Files: 0
0 changed

* feat(002): Phase 6 Build Optimization Summary

Tasks: T042, T043, T044, T045, T046, T047, T048, T049, T050, T051, T052

Phase: Phase 6: User Story 4 - Developer Builds Services Efficiently

Files: 0
0 changed

* feat(002): Phase 7 Complete - Documentation Synchronization Validation

Tasks: T053, T054, T055, T056, T057, T058, T059, T060, T061, T062

Phase: Phase 7: User Story 5 - Documentation Stays Synchronized with Code

Files: 15 changed

* refactor: rename ADR files and update references in documentation

* feat(002): Phase 9: Polish & Cross-Cutting Concerns

Tasks: T071, T072, T073, T074, T075, T076, T077, T078, T079, T080

Phase: Phase 9: Polish & Cross-Cutting Concerns

Files: 11 changed

* refactor: rename services in docker-compose files for consistency

* refactor: remove task references from comments in validation scripts

* chore: update checkout step to fetch full history for accurate diff comparisons
@dgtalbug
dgtalbug merged commit 667a306 into main Jan 10, 2026
5 of 17 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant