Skip to content

docs(kickoff): post-install liveness smoke DESIGN R-phase (#550 remaining scope) - #625

Merged
artyhoo merged 1 commit into
stagingfrom
chore/postinstall-smoke-kickoff
Jun 17, 2026
Merged

docs(kickoff): post-install liveness smoke DESIGN R-phase (#550 remaining scope)#625
artyhoo merged 1 commit into
stagingfrom
chore/postinstall-smoke-kickoff

Conversation

@artyhoo

@artyhoo artyhoo commented Jun 17, 2026

Copy link
Copy Markdown
Owner

What

Adds the design R-phase kickoff for the post-install liveness smoke — the remaining scope of the shipped-artifact-liveness-gap umbrella per parent tracker #550 (no new umbrella; homed here).

Must land on staging before any aif dispatch (kickoff-staging-placement rule — dispatch consumers read kickoffs from staging).

Key contents

Scope

Single kickoff under .claude/orchestrator-prompts/ (tracked, gitignore-negated). No code, not on the §1.7 path list.

…tifact-liveness-gap remaining scope, #550)

Design-only R-phase brief for the post-install liveness smoke — the unbuilt
#550 meta-proposal (actually RUN each shipped capability post-install, surface
silently-dead). Homed under the shipped-artifact-liveness-gap umbrella per #550
(no new umbrella). To be dispatched to aif-handoff.

Records the operator's binding steer (2026-06-17): CI is dispreferred as a
channel (aligns with README 'CI = last-resort gate'); design must prefer earlier
channels (install --verify / operator doctor / pre-push). Channels left OPEN for
the R-phase to resolve. Carries §5 AI-traps (principle 12) + §4c park-don't-guess
contract for autonomous aif dispatch.

Prior-art: skipped — orchestrator-prompts kickoff (planning artifact), no capability change; BFR/SSOT consult is the dispatched R-phase's own deliverable.
@artyhoo
artyhoo enabled auto-merge (squash) June 17, 2026 17:12
@artyhoo
artyhoo merged commit e107eb0 into staging Jun 17, 2026
44 checks passed
artyhoo added a commit that referenced this pull request Jun 17, 2026
… smoke (#550) (#626)

PR #625 wrote an aif-dispatch DESIGN kickoff prematurely. Operator-corrected flow
(2026-06-17): the design must first be determined in a fresh interactive BRAINSTORM
session (discuss all facets), THEN a plan, and ONLY THEN an aif-dispatch kickoff
authored from the brainstorm results. The #625 kickoff jumped to the final phase
and delegated design-determination to aif — out of order. Removing it; the
brainstorm-plan precursor replaces it.

Prior-art: skipped — removes a premature planning artifact under .claude/orchestrator-prompts/, no capability change.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant