0.27.0
The planning store implements the contract it is held to, and every verb that writes goes through one door. Two independent reviews of this work found 27 defects between them; all of them are fixed here, and the ones that were false claims are named rather than quietly corrected.
Added
-
aep-backend-markdownis a contract implementation.MarkdownBackendimplementsCommandServiceandQueryService; the sixteenaep-conformancesuites run against it and are shown to fail it under injected faults, because a suite that has never failed is not evidence that it can. Deviation D-P1 is closed.The contract logic is not written twice: every command goes to
aep-backend-memoryand this crate adds durability. Idempotency, revision conflicts, "a refusal still leaves an audit record" — each is a decision whose wrong version looks right, and two implementations drift in exactly the ways a suite run months apart discovers. -
aep-backend-sqlite— the first database backend. One file, no server, adapted overentity-runtime's transactional store rather than written again here. -
Two new commands, and their absence is why D-P1 stayed open.
aep.status.move/v1andaep.evidence.record/v1. The planning store's ladders are data with an open status vocabulary, and an evidence record is the input to the evidence-gated move — neither had a command, so the CLI wrote both behind the contract.UpdateEntity's own documentation says astatuskey there is a mistake; there was simply no command that named the move. -
eval.matrix/1has a fourth column,advisory. An advisory row judges whether the evidence is worth anything, not whether the run did anything wrong; counting one inviolatedpublishedviolated: 1against runs that behaved perfectly. Omitted when zero, so a matrix written before it reads unchanged. -
Three gate steps:
cargo xtask guards(no test body duplicated),cargo xtask claims(a released### Fixedentry names something that existed to be broken),cargo xtask version(the workspace version matches the newest tag, soprotocol --versioncan say which build it is). -
protocol artifact validatereconciles the journal against the files, and reports every status that reached its rung on an asserted rather than a recorded provenance.
Fixed
-
A status could reach a document with no ladder consulted. The contract permits a
statuskey on anUpdateEntity— its own suites use one — so the store is the only layer that can refuse an illegal move, and it did not: a story atdraftreachedactivewithdraft: [proposed, archived]declared. AMoveStatusstays exempt, because the engine has already decided it against the ladder and the evidence presented. -
MoveStatusbypassed the immutability check, so a review result — the one kind that exists to be uneditable — could be edited after the fact. It also declaredexpected_revisionand never enforced it, silently dropping a caller's assertion about what it had read. -
A relation was journalled as
Change::BodyReplaced, a repeated--relatebumped a new artifact to revision 3, and a replayed command re-wrote the file — three defects compounding, all from the same place: the no-op guard ran after the revision had already been incremented, so it was dead. -
protocol artifact new --relatewith an unresolvable target wrote the artifact, journalled it, and then failed — leaving the caller told the command failed and holding a document without the edge they asked for. Targets are resolved before anything is written. -
The latch did not cover reads, in either durable backend, though both modules said it did.
-
protocol artifact evidence --atwas ignored once the verb went through a command. The instant travels on the command now, because the clock is read at the edge and handed in. -
Seeding refused any store holding a cross-repository relation, which broke
protocol artifact newon this repository's own plan. A crossing is not a dangling edge.
Changed