The "most useful and user-friendly" release — implements the competitive
audit vs. LTpowerPlanner (docs/AUDIT-2026-08-08-competitive.md), keeping
everything deliberately small.
- SI-suffix value entry everywhere: type
100m,4.7u,2.2k,
50 mΩin any electrical field; engineering-notation display; invalid
input flags red instead of silently mangling. - Cost + board-area fields (optional, per element) with per-tree
rollups in the executive summary, HTML report, Excel, CLI and library
parts — the LTpowerPlanner comparison axes, vendor-neutral. - Compare architectures (Project menu, Ctrl+Shift+A; CLI
compare;
MCP tool): every tree side by side on power, efficiency, loss, cost,
area, growth capacity and findings. - PMIC modelling pattern:
Quad-output PMICtemplate + user-guide
section — one block, one converter per rail, shared refdes and Iq;
electrically exact for DC budgeting without a DAG rewrite. - Gesture polish: clickable datasheet links (↗), F2 / double-click
rename, double-click a block outline to collapse (and a summary node to
expand), first-run empty-canvas hint.
Explicit non-changes (per the audit's no-over-engineering rule): no SPICE,
no vendor part database, no cloud, no DAG, no UI modes.