v0.20.0
Changed
- Work charts drop the time axis (spec 0.8.0): dependency-sequence position, scope-point width (stories + acceptance criteria, no estimation), XS/S/M/L/XL buckets, execution-fact states. Un-bridged projects get the chart too.
Added
- The
aftersequencing relation with the always-blockingsequence-acycliccheck.