Skip to content

10 Tips Faq

PedroLageTavares edited this page Jun 29, 2026 · 1 revision

10. Tips & FAQ

A few handy tips, a plain-English glossary, and answers to common questions.


Handy tips

  • Print a worksheet for the shop floor from a saved project (settings, ink, and materials on one page).
  • On mobile, use the bottom tab bar for Dashboard, Projects, Service, Analytics, and Settings; tap the hamburger (☰) for everything else.
  • Install the app for full-screen use and offline access — see Getting Started.
  • Lost connection? An amber banner appears; pages you've opened keep working and it reconnects automatically.

Glossary

Term Plain meaning
COGS Cost of Goods Sold — total cost to make one item
BOM Bill of Materials — the list of materials used in a job
Margin Profit as a percentage of the sell price
Channel One ink color (C, M, Y, K, W, GL, FW)
Craft face One printed surface of a multi-part project
Overhead A % added to cover rent, power, and other running costs
PWA The app you can "install" from your browser

FAQ

My profit numbers look wrong — why? Check Settings: ink costs, labor rate, and overhead drive every calculation.

An ink level seems off. Log replacements in Service, or use an ink correction to adjust (you can undo).

How do I free up my projects list? Archive finished jobs — they're hidden but never lost.

Can I get my data out? Yes — export projects to CSV, download an inventory PDF, and take a backup from Settings.

It's not asking me to install on iPhone. iPhone doesn't auto-prompt — tap Share → Add to Home Screen.


⬅ Back to the Manual Home

Clone this wiki locally