Skip to content

v0.18.0 - Evidence Authority and Review UX

Latest

Choose a tag to compare

@woconnell1 woconnell1 released this 03 Oct 01:20
· 2 commits to main since this release
d2d4a4c

v0.18.0 — Evidence Authority and Review UX

This release consolidates the Engineering Studio work since v0.17.0 on frozen evidence hydration, phase-aware dialogue, equivalent-evidence discovery, reviewer challenges, explicit finding lifecycle and the Review Room / Engineering Evidence journey.

  • Shared software version authority for API/OpenAPI and health.
  • Clear source inspection and supporting-evidence actions, snapshot context and optional review context.
  • Machine-action transcript labels and preservation of private drafts.
  • Dialog keyboard focus containment/restoration and safe Escape behavior.
  • Updated root README, current repository documentation and all 12 formal Word/PDF manuals.
  • Development pytest 9.0.3 security update; production PyJWT remains 2.15.1.

Production uses explicit shadow reasoning validation and shadow review planning. Legacy reasoning and student-visible selection remain authoritative; no PR5 authority transfer is included. Frozen snapshot FACT remains immutable; reviewer interpretation remains challengeable. Only authoritative corrected/resolved findings close. Inspection, fluency, recommendations, review completion and later commits do not silently close older findings or imply grades.

Production acceptance was established for source 6ba92bf through protected deployment 37081818322, revision etis-studio-prod--0000102, operator acceptance and maintainer human smoke. Subsequent documentation-only corrections and release-edition finalization have separate source provenance. See docs/operations/V018_PRODUCTION_ACCEPTANCE_2026-10-02.md for the dated record.

Local validation: 972 tests passed, with two PostgreSQL integration tests skipped locally; protected CI/deployment included PostgreSQL, Bicep, dependency audit and production container checks. Existing offline journey and keyboard war games passed. All 12 paired manuals were rendered and visually verified. Historical screenshot/diagram bitmaps retain documented small/low-contrast-label limitations; no accessibility certification or live semantic-quality proof is claimed.

The accepted Review Room / Engineering Evidence UX is frozen. See docs/NEXT_BUILD.md for the revalidated backlog. Historical release, baseline and Gate17 evidence retains its original versions and dates. GitHub's release/tag metadata records the actual publication timestamp.

Final release acceptance: