Sprints 3 Retrospective

Introduction

This was the first two weeks long sprint. In it were implemented the first scenes of the game main flow.

Went Well

  • Transition between scenes worked satisfactorily.
  • All members of the group learned about the game structure.
  • Paring has been efective.
  • Scrum Master worked well.

Went Bad

  • Technical debts persisted.
  • One member still missing. (Traveling)
  • User Stories was confusing.
  • Still no tests.
  • Some meetings didn't happen.
  • Two weeks long sprints didn't worked well.

Improvements

  • Team should better apply the methodology, performing continuous deliveries throughout the sprint.
  • Formalize acceptance criteria for stories.
  • Allocate team to the study of tests.
  • Fixed meeting times.
  • Sprint duration is again one week.

Knowlegde Board

Sprint 3