chore: finalize Lock the Hashes milestone#266
Conversation
|
Warning Rate limit exceeded
⌛ How to resolve this issue?After the wait time has elapsed, a review can be triggered using the We recommend that you space out your commits to avoid hitting the rate limit. 🚦 How do rate limits work?CodeRabbit enforces hourly rate limits for each developer per organization. Our paid plans have higher rate limits than the trial, open-source and free plans. In all cases, we re-allow further reviews after a brief timeout. Please see our FAQ for further information. WalkthroughDocumentation updates to the Lock the Hashes roadmap tracking completion of domain-separated hash contexts and benchmarks pipeline cleanup. Status fields transitioned from In Progress/Pending Review to Completed/Verified with updated evidence references linking PRs and audit timestamps. Changes
Estimated code review effort🎯 1 (Trivial) | ⏱️ ~3 minutes Possibly related PRs
Suggested labels
Poem
🚥 Pre-merge checks | ✅ 4✅ Passed checks (4 passed)
✏️ Tip: You can configure your own custom pre-merge checks in the settings. ✨ Finishing touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
There was a problem hiding this comment.
Actionable comments posted: 3
🤖 Fix all issues with AI agents
In `@docs/ROADMAP/lock-the-hashes/benchmarks-cleanup.md`:
- Line 34: The roadmap entry incorrectly marks the milestone closure as merged
inside PR `#266`; update the checklist in
docs/ROADMAP/lock-the-hashes/benchmarks-cleanup.md so the audit trail is
accurate by either leaving the DoD checkbox unchecked until PR `#266` is merged or
by adding a second checklist line that records PR `#266` as pending (e.g., keep
the existing "- [x] Code reviewed and merged (PR `#265`, merged
2026-02-13T05:45:06Z)" and add a "- [ ] Milestone documentation finalized (PR
`#266`, pending merge)" line) so PR `#265` and PR `#266` statuses are both
represented.
In `@docs/ROADMAP/lock-the-hashes/README.md`:
- Around line 23-26: The roadmap README uses both "Verified" and "Completed"
inconsistently (e.g., the milestone row shows "Verified" while feature rows like
domain-separated-hashes.md and benchmarks-cleanup.md show "Completed"); pick a
single taxonomy and apply it consistently (either change the milestone status to
"Completed" or change feature statuses to "Verified") and add a
STATUS_DEFINITIONS.md (or GLOSSARY.md) that defines the states (e.g., In
Progress → Completed → Verified → Archived) so future readers know the
hierarchy; update README.md table entries and any referenced feature files
(domain-separated-hashes.md, benchmarks-cleanup.md) to match the chosen
terminology.
- Line 9: Update the tense on the sentence referencing Hasher::new() so it
matches the milestone status "Verified" and the "Completed" feature flags:
change "currently use bare `Hasher::new()` without domain-separation prefixes"
to a past/historical phrasing (e.g., "used bare `Hasher::new()` without
domain-separation prefixes") or explicitly state it was the prior state and has
been fixed; ensure the line mentions the same identifiers (`state_root`,
`patch_digest`, `commit_id`, and the RenderGraph canonical bytes hash) so
readers can correlate the change with the resolved work.
This PR finalizes the 'Lock the Hashes' milestone following the merge of PR #265. It updates the roadmap to reflect 'Verified' status with the correct merge timestamp and evidence links.