Skip to content

WIKI_TOC

ganadara135 edited this page May 19, 2026 · 9 revisions

Parametric Road V1 Wiki Drafts

Target release: v1.0.1

These files are draft source pages for the GitHub Wiki.

Current release links:

Recommended publish order:

  1. Home
  2. Quick Start
  3. Workflow
  4. TIN Terrain
  5. Alignment Stations Profile
  6. Assembly Region
  7. Applied Sections Build Corridor
  8. Review
  9. Earthwork
  10. Structures Structure Output
  11. Drainage
  12. Troubleshooting
  13. Developer Guide

Release rule:

  • v1 is the primary workflow.
  • Drainage is an active source stage with Elements, Policies, Flow Routes, Structure refs, Flow Network preview, and Drainage Review.
  • Advanced hydraulic analysis and automatic pipe sizing remain future work.
  • Watertight Solids is the final output stage after AI Assist and is gated on Build Corridor prerequisites.
  • Generated geometry, preview meshes, markers, and reports are outputs, not source truth.

Clone this wiki locally