Skip to content

[squad:plan] Signal Bloom — M2 Rooftop Relay Vertical Slice (Engineering) #57686

Description

@github-actions

Owner: Fenster — Engineering

Build one fully playable district slice with the final core systems: routing, placement, obstacles, scoring, and progression flow. This milestone should establish technical feasibility, controller support, save structure, and a stable content-authoring workflow for levels.

Part of the Signal Bloom game plan.
Related to #57685

Generated by 🎮 Squad Game Planner · copilot · auto · 47.2 AIC · ⌖ 5.07 AIC · ⊞ 10.1K ·

  • expires on Sep 2, 2026, 3:59 AM UTC-08:00

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions