ARCHITECTURE MSDAP TOP SYNTHESIS MAIN FSM PROCESSOR MODULE GENUS – AREA REPORT GENUS –TIMING REPORT GENUS POWER REPORT GENUS TIMING SUMMARY CRITICAL PATH CRITICAL PATH HISTOGRAM PHYSICAL DESIGN FLOORPLAN CORE UTILIZATION AFTER PIN PLACEMENT AND POWER STRAPS AFTER PLACEMENT WITHOUT NETS AFTER PLACEMENT CONGESTION TIMING SUMMARY REPORT Utilization after Placement TIMING REPORT(SET UP) AFTER CTS TIMING REPORT (HOLD) AFTER CTS TIMING REPORT (HOLD) TIMING REPORT (HOLD) CLOCK TREE CLOCK TREE REPORT POST ROUTE TIMING REPORT (HOLD) POST ROUTE POST ROUTE WITHOUT NETS AREA REPORT DRC REPORT POWER REPORT POWER DISTRIBUTION SUMMARY