Operator act needed: run the #195 drill on a fresh Debian — one session discharges four acceptance criteria and PR 199's round 2 #200
Replies: 8 comments
|
Premise update, 2026-08-29 1 — what changed. This thread's title says one session discharges four acceptance criteria and PR 199's round 2. The round is gone: the builder answered round 1 whole at What has not changed is the evidence. The reworked drill has still never been run. Every criterion ticked at the merge is a fixture, a grep, a CI context or a document read; this thread has held no comment of any kind since it opened. 2 — the ledger, corrected upward. It is six criteria across three closed issues, not four across one. All three of #192's children closed on
The last two are new to this door and were priced for the first time today. They are the same class of live-convergence evidence, they were never named here, and the default run does not touch them — the instrument converges 3 — the commands. The first is unchanged from the ask above and still executable exactly as written: the candidate branch still resolves to # the default run — discharges five of the seven rows above
RIG_REPO=andriujoseba/rig
RIG_REF=build/195-one-command-drill
TS_AUTHKEY=tskey-... # tag:local
bash <(curl -fsSL "https://raw.githubusercontent.com/$RIG_REPO/$RIG_REF/drill/drill.sh") \
--rig-repo "$RIG_REPO" --rig-ref "$RIG_REF" --box-ref 0.9.0 \
--users-from-github danmt --run-id drill-2026-08-29-a --yesEach of the two role passes is the same line with Prerequisites are 4 — one trip may now produce two records. box PR 248, the 5 — nothing is blocked, and there is a backstop. rig cannot cut a release without a drill record: 6 — the answer that closes this door without a run. Say "it rides the next cut" and triage records that on #193, #194 and #195 as the wake for their remaining criteria and closes this thread. No flag moves either way; nothing here is a hard block on anything. |
|
Premise update, 2026-08-30 1 — the runbook still works, checked rather than assumed. This door's whole value is a command, so I re-derived it before writing anything else: 2 — clause 4 is withdrawn: one trip no longer produces two records. It read "box PR 248, the Nothing about rig's run changes, because the offer was scheduling only and never a dependency in either direction. But this is the second withdrawal of that same offer in two days — made 3 — the It was recorded as retracted on #192's task list at 4 — what this door is now, stated plainly. rig has no open issue and no open pull request — the board is empty, Both answers named in clause 6 of the last comment remain available and still cost one sentence: paste a run — a failed run is a valid answer and is pasted the same way — or say "it rides the next cut", and triage records that on #193, #194 and #195 as the wake for their remaining criteria and closes this door. |
|
Premise update, 2026-08-31 Polled 1 — what went falsea. "rig's board now holds no open issue and no open pull request" (the What that does not change: it is an b. "which number carries this narrowing is the open question on [discussion #197]" (this door's opening body, under What to do with the output). @danmt answered #197 today — "lets do both into the same epic whether its 0.3.3 or 0.4.0 i dont really care that much, i just want to make sure we dont lose the research points" — and that thread is closed as resolved. The number is decided at the cut, not before. c. What survives, and now for a second reason. "No 2 — the runbook, re-derived rather than assumed, and it shortensPR 199 merged on
Byte-identical, so either form runs the same instrument — a prepared run against the fork is not wrong. But The command is RIG_REPO=heavy-duty/rig
RIG_REF=main
TS_AUTHKEY=tskey-... bash <(curl -fsSL \
"https://raw.githubusercontent.com/$RIG_REPO/$RIG_REF/drill/drill.sh") \
--rig-repo "$RIG_REPO" --rig-ref "$RIG_REF" --box-ref 0.9.0 \
--users-from-github danmt --run-id drill-2026-08-31-a --yes
3 — the ledger is unchanged, and nothing has tickedSix criteria across three closed issues (#193, #194, #195), exactly as the One thing worth adding, because #204 changes where the debt lands if this run never happens: the window's own drill runs at the cut, on a branch that is red on 4 — what this door asks, unchangedOne session, stdout pasted whole. Post it here or on #195 — either is fine now that #195 is closed; triage does the bookkeeping against the criteria in both cases. No tripwire replaces the struck one, and nothing here sets a flag: no issue on this board is claimed or assigned, |
|
Premise update, 2026-09-02 — do not run the command block on this page. Every line of it is now wrong in at least one way, and a session spent on it would produce a record that discharges nothing. The ask itself is unchanged in kind and still asks nothing of any assignee; what moved is its shape and its wake. Polled rather than recalled. 1 — the runbook on this page is superseded, in four independent ways
Two more sentences on this page have gone false and are corrected here rather than left standing: "rig's board now holds no open issue and no open pull request" — the board holds four open issues (#204, #206, #211, #220) and one open PR (#221); and "No 2 — the four criteria are not orphaned, and this is where they wentTheir substance survives whole — a drill runs end to end on a fresh Debian 13, the record's path and full text reach stdout,
The new procedure, as specified — three lines, and it is the whole thing: # on your machine, in the checkout you want to drill
bash dist/release-artifact.sh --version 0.3.3-rc1 --assets-dir /tmp/a
scp /tmp/a/rig-0.3.3-rc1.sh root@drill-host:
# on the throwaway Debian 13, as root — no git, no credentials, no ref to retype
bash rig-0.3.3-rc1.sh
TS_AUTHKEY=tskey-… /opt/rig/current/drill/drill.sh --users-from-github danmt --yesNeither half of that exists yet. #219 builds the artifact and is 3 — so there is nothing to book today, and that is the actionable partThis door stays open and its ask stays a hard block — the run has still never happened, and silence is the one outcome that makes that debt invisible again, which is the sentence this page has always closed on. But the session cannot usefully be booked until #219 and #220 have merged, because the instrument it needs is being built right now. Booking one against the current instrument would burn a fresh host and produce a record that neither #206 nor #195 accepts.
No new tripwire is set here, and the reason is stated so its absence is not read as an oversight. What this run waits on is now a merge queue rather than an operator's calendar — #220 landing is the wake condition, it is visible on #206's task list, and a date-based nudge would fire against work that is actively moving. Triage returns here when #220 merges, with the runbook rewritten to the three lines above and re-derived against the tree that ships them rather than pasted from this comment. (One thing worth carrying into the eventual record: box's own |
|
Premise update, 2026-09-03 — the digit this door's evidence rides is now 1 — @danmt ruled the window's number, and this page quotes it by filenameOn #211,
So #206 is rig Why that reaches this page rather than only those issues. The comment above quotes #206's acceptance criterion as the thing this run discharges, and quotes it by the record's filename:
2 — the board census in that comment has moved, and it moved the right wayIt read "four open issues (#204, #206, #211, #220) and one open PR (#221)". Re-taken
3 — what this door is waiting for, unchangedThe wake is still a merge, not a calendar. #220 lands → the cut is claimed → the Nothing here asks you for anything today, and there is nothing to schedule yet: the instrument this door's evidence must come from is still being built in PR #223. Triage closes this thread in the pass that ticks those criteria against the session's stdout. A run booked before #220 merges still buys nothing — that is the |
|
Premise update, 2026-09-03 Polled rather than recalled. The instruction from the 1 — what fired
Every build member of the #206 window is closed — #207, #208, #209, #210, #216, #219, #220. There is nothing left to wait for. 2 — the run, against PR #225's headThe authority is The substrate. A throwaway Debian 13 VM — not a container, and not box new --name drill-rig --vm --cpu 4 --memory 8GiB --disk 60GiB
incus exec drill-rig -- bash -l # NOT `box shell` — see trap 4The three lines. The first two on your machine, in a checkout of bash dist/release-artifact.sh --version 0.4.0 --assets-dir /tmp/a
scp /tmp/a/rig-0.4.0.sh root@drill-host:
bash rig-0.4.0.sh
TS_AUTHKEY=tskey-... /root/.local/share/rig/current/drill/drill.sh \
--box-ref 0.10.0 --users-from-github danmt --run-id drill-2026-09-03-a --yesFour traps, each of which costs a re-run. They are the ones #220's D2 corrected, and they are the builder's list rather than a fresh one:
The record's filename is not something you can get wrong from this command. A failed run is a valid answer and is pasted the same way. It names what the instrument does on real hardware, which is the whole point. 3 — what the one session buys, so it is not run twicePaste the complete final stdout on #211. That single paste discharges:
Triage ticks each set where it lives and closes this thread in that same pass. 4 — what is not a reason to waitPR #225 is red, and the red is the design. It fails Nothing here asks the assignee for anything. @cndgrr's claim is parked — confirmed by triage this pass — and no push of theirs produces this evidence; 5 — the tripwire, which is triage's and not yoursA parked claim carrying an open PR is invisible to the 48-hour reclaim sweep by construction, so this wait again has no automatic floor. If no stdout has landed on #211 by One thing worth putting in the record if it holds. box's own |
|
Premise update, Measured this pass against the committed record and the criteria's own text, not recalled. 1 — the run@danmt ran the A failed run was always a valid answer here and this one is a real record — #211 D10 ruled that a red record ships and neither failure re-runs it. Nothing below is a complaint about the result. Do not run the 2 — the seven-row ledger, re-priced against what the record actually saysThe ledger is the one this door has carried since the Rows 1–4 — #195's four. Answered by the run; the tick waits on a paste, not a machineTriage read these criterion by criterion at
All four tick off one paste. @danmt's own comment reports the original stdout preserved locally with SHA-256 checksums, so nothing here books a second machine. Row 5 — #194's leg 2. The run answered it, and the answer was noThe criterion, verbatim: "The drill's leg 2 runs a real round-trip on a machine that never had Docker, and the record says The record: This row is not merely un-discharged — the session booked to discharge it produced the exact word the criterion excludes, and this door never priced that possibility. The cause is known and is not the machine's. #228 measured it: The consequence for this door is a dependency it has never carried: row 5 is not bookable by anybody. #228 is closed as folded and its spec rides #204 as Candidate B, unminted, in a window that is shut. Until that fix ships, every future drill reproduces this same Rows 6–7 — the two role passes. Untouched, and each still needs its own guestThe run converged
Each is the same invocation with 3 — why this door stays open, stated plainlyBecause the outstanding ask lost its page. #195's four criteria name their wake as "the operator pastes the complete final stdout on #211" — and #211 closed at What it asks for now, in full:
One thing worth knowing about the ordering, and it is the only thing here with a clock: rows 1–4's evidence already exists and lives on one person's disk. Everything else this door has ever asked for could be produced again on demand; that transcript cannot, if it is lost. That is an argument for the paste being the cheap thing to do first, not a deadline on anyone. 4 — the tripwire in the
|
|
Premise update, Measured this pass against the closed bodies and this thread's own comments, not recalled. 1 — the row the re-pricing dropped: #220's leg-1 criterionThe
The Where it stood while nobody was looking. The criterion is:
It is operator-owned, reclassified in #220's body at Re-homed here today, in #220's body where the criterion stands rather than only in this comment. It books no second machine — the transcript exists on @danmt's disk with SHA-256 checksums, and this is the same paste rows 1–4 ride. 2 — what the paste discharges, corrected
So the ask on this door is exactly what it was, with one more thing riding it: the complete final stdout of the 3 — three bodies were closed with their ticks unwritten, and that is fixedFound by re-reading the closed pages rather than the comments on them, which is what turned up §1 as well:
Nothing here sets a flag and nothing asks the assignee of anything, because there is no assignee anywhere on this board. rig's open board is still one shut release window (#204), no queue label, no open pull request, nothing claimable — so nobody is idle for this paste and nothing is blocked on it. No tripwire is set, for the reason this door already gave twice: a deadline with nothing waiting behind it is theatre. — triage, |
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
@danmt — #195 needs one live drill run on a fresh Debian machine, and this thread is the door for it. That single run is the entire remainder of rig's open board.
Opening it because triage set a tripwire on itself and it has now fired. The
2026-08-26 16:2xZcensus on #195 said: if no run stdout has landed by2026-08-28 12:28Z— 48 hours from the builder's last handoff re-statement — triage re-examines this claim and opens an "Operator act needed" discussion door for the run, the way #132 and #173 were opened. Re-read at12:2xZtoday from #195's own timeline and PR 199's state rather than from the thread: no stdout, and no push, review or comment anywhere since2026-08-26 12:28:20Z. A claim carrying an open PR is invisible to the 48-hour staleness sweep by construction, so this wait has no automatic floor. This thread is the floor.State, measured today rather than recalled
claimedby @andriujoseba since2026-08-26 11:46:42Z;enhancement+scope:drill+scope:docs; the last write of any kind on it is triage's own at19:52:08Z06470dee,MERGEABLE/CLEAN,state:addressing, every check context green at that head (eight rollup entries, six distinct)2026-08-26 12:20:52Z— one approval, two changes-requested; the fixes are pushed, and the builder is holding the round-complete signal until the stdout arrives (12:25:48Z)--users-from-github danmtconverging operators, and a second person followingdrill/README.mdwithout reconstructing a step. Stated by triage on the issue at16:2xZandriujoseba/rigbranchbuild/195-one-command-drill@06470dee; its raw URL serves200, checked12:2xZ.heavy-duty/rigcarries no such branch, so the fork form below is the only one that resolvesThe run
The prerequisites are
drill/README.mdat the candidate head, which is the authority — read that, not a paraphrase of it; the instrument enforces every one of them in pre-flight, before the tailnet key is spent. Its own command form, with the fork's repo and ref substituted:Three things the README carries that the handoff comment does not, each of which stops a run at the door:
--yes. The handoff's command omits it. The drill is destructive on purpose and confirms interactively; with no TTY it exits2(drill.sh:441). Keep it for an unattended run.box new drill-rig --template blank --vm --cpu 4 --memory 8GiB --disk 60GiB. Notstaging-box— that template converges rig at mint throughBOX_BOOTSTRAP_ROLE, so the guest is not scratch. A container is not a substrate at all, andbox doctorneeds box0.9.0or newer to pass nested.box shellpreserves a non-adminSUDO_USER, which pre-flight now refuses by name — the trap that cost the 0.3.2 session a whole run. Enter withincus exec drill-rig -- bash -l, orunset SUDO_USERin a root shell.TS_AUTHKEYis a single-use,tag:localkey for the defaultstaging-serverrole.--rig-refand--box-refare both required, and--box-refis a tag on purpose.What to do with the output
Paste the instrument's complete final stdout into a comment on #195 — that is exactly the convention this issue is writing down, in
drill/README.md's Who runs it, and where the record goes.No
drills/commit is asked of this run. 0.3.2 shipped2026-08-25 23:57Z, no cut is in flight, and which number carries this narrowing is the open question on discussion #197. The record the instrument writes to/root/drills/<version>.mdis acceptance evidence for #195's criteria and nothing more; a release record is committed on a cut branch, and there is no cut branch.A failed run is a valid answer. Two of #195's criteria are refusals that must fire, and the gate wants evidence, not success. Please paste the stdout either way.
What happens after
The stdout lands on #195 → its four operator-owned criteria become checkable, the builder signals round 2 and takes PR 199 out of draft, the panel re-reads the tree it shipped, and #195's close is the last one epic #192 needs. Nothing else in rig is queued behind anything.
If the run is not happening this cycle, say so here
That is a useful answer, and it changes what triage does. @andriujoseba's claim on #195 has been parked on this run since
2026-08-26 16:01Zand, carrying an open PR, will never age out on its own. If you tell this thread the run is not coming soon, triage re-examines that claim on the record instead of letting it sit.What triage cannot do is pick this one. TRIAGE.md's past-24-hour rung has triage choose the option a builder proceeds on when a ruling goes unanswered — but that rung needs an option triage can execute, and every option here is an act on a physical fresh host.
Default: none — hard block.For the same reason #195 carries no flag:needs-rulingnames a decision only a human owns and this is an act, not a decision;attentionnames a demand parked for the assignee, and the ball here is yours rather than theirs.Triage's next tripwire, again set on itself, isStruck 2026-08-302026-08-30 12:28Z. If neither the stdout nor an answer here has landed by then, triage re-examines #195's claim in public on the issue and records what it weighed.20:4xZ— retracted, spent rather than fired. The claim it promised to re-examine ended before its deadline: @danmt merged PR 199 at2026-08-29T20:20:29Z, #195 closed at20:20:31Zon itsClosesreference, and the assignee was released with it — so there was no claim left to re-examine and nothing for the tripwire to fire on. It was recorded as retracted on #192's task list at22:3xZon 2026-08-29 and not here, which left it standing live on this page for a day; a settled call has to reach every body that states it. No new tripwire replaces it — rig's board now holds no open issue and no open pull request, so nothing waits on this run and a deadline here would be theatre. The last sentence of the struck text stands and is why this door stays open: silence is the one outcome that leaves this debt invisible again.All reactions