Skip to content

percent calculation of server change-type is a way off - stuck at 80% #1407

@c33s

Description

@c33s

TL;DR

i started the type change from ccx31 240 GB max disk 22 GB used to ccx53 600 GB max disk, at 20:45.

after about 10-15min i was at 80% since then i am stuck at 80% currently at 2h07min. the gui shows the same 80%. thats not very accurate.

Expected behavior

if something like disk pre-allocation and/or copying between datacenters have to take place this should be calculated into the percentage and also outputted on the cli.

it is relevant if i assume that the virtual machine i just shutdown, a dynamic disk size is adapted and the vmachine starts again ~1-2min downtime and in reality 22gb get copied from one datacenter to another and then a low prio full disc allocation of 600 gb takes place (or in worst case the 600gb image gets copied to another datacenter after the new size allocation).

also information about how long this could take should be in the docs and maybe even in the cli output if i start the process. at least some info that the process is correctly running and maybe an eta on how long it takes to better prepare server downtimes.

some info if i can simply close the terminal where i opened hcloud to let it continue on backend side without my pc running would be helpful.

Observed behavior

inaccurate time calculation and not knowing if everything is ok or how long it will take.

Minimal working example

hcloud server change-type --keep-disk=false app31.example.com ccx53

Log output


Additional information

No response

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions