You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Added
conduct-ts validate-wired-into <plan> resolves a plan's Wired-into: anchors at DECIDE time through the same machinery BUILD-time completion verification uses, and exits 1 on any anchor that cannot resolve. (implementation PR #1190).
conflict-check detects oscillating requirements — pairs that are individually satisfiable but mutually exclusive, which send work round a non-terminating kickback loop. coherence-check gains a fail verdict and a consistency pass for cross-layer contradictions that coverage alone cannot express. (implementation PR #1394).
The release-metadata check now labels each PR with the semver impact it declares (semver:major/minor/patch), so merge order is readable from the PR list. (implementation PR #1405).
Worktrees now get a preventive pre-commit hook that blocks commits touching another feature's sealed DECIDE artifacts (.docs/architecture, .docs/decisions, .docs/plans, .docs/specs, .docs/stories) during BUILD/SHIP, and remediation gaps that target a sealed artifact are now redirected to the owning DECIDE step. (implementation PR #1396).
The daemon, spec authoring, and spec landing now refuse to dispatch or land work whose ADRs are not declared APPROVED or SUPERSEDED, closing the gap where a merged spec with an unapproved architecture decision could still reach build. (implementation PR #1384).
Spec and implementation PRs now inherit the originating issue's priority: criticality labels. (implementation PR #1440).
Changed
The validation-phase fan-out now defaults to 4, so the SHIP-tail group (manual test, PRD audit, as-built architecture review) dispatches in a single wave instead of two. (implementation PR #1413).
Fixed
The land-time coherence gate now checks that stories tie out to the PRD in both directions — a story citing a requirement the PRD never declares, or citing none at all, is reported as a gap. Plan Wired-into: anchors are now validated as a blocking gate at every tier instead of by an optional command, and the plan skill judges the residue the matcher cannot decide: an anchor into a file the same task creates, or one whose match is an import, comment, or re-export rather than a call. (implementation PR #1401).
A pull request whose ## Migration section is its last section no longer fails its own release gate at finish; the release metadata block below it is parsed correctly instead of being swallowed into the migration content. (implementation PR #1404).
A pull request whose ## Migration section sits above its release metadata block, or is followed by a trailer, no longer fails the finish-time release gate as non-canonical, and the merged body no longer duplicates the Migration section. (implementation PR #1406).
conduct-ts shipped-record reports success on stdout, so a successful ship no longer appears in the daemon log tagged [error]. (implementation PR #1407).
build_review now treats prior wiring_check gate instructions recorded in the event ledger as evidence when grading scope, so plan hunks that implement a gate-mandated fix are no longer wrongly flagged as out-of-plan work. (implementation PR #1452).
Update checks now use the schema-owned conductor configuration and automatically migrate supported legacy preferences. (implementation PR #1412).
The remediate step may now amend a plan in response to a blocking gate; the build step still may not. (implementation PR #1459).
wiring_check no longer treats a Markdown or .docs/ mention of a symbol as a production reference, so a task declared inert is no longer flagged stale against its own plan document. (implementation PR #1460).
Security
Intake filing now redacts credentials and operator-identifying paths from the issue title and body before publishing, and reports what it replaced. (implementation PR #1420).
The daemon's DECIDE-entry grant is now stored outside the feature worktree so a build agent can no longer authorize its own DECIDE entry, and the plan step can never be granted at all. (implementation PR #1403).