Skip to content

Work Charter v0.8.0

Choose a tag to compare

@junwei529 junwei529 released this 24 Sep 16:35

Work Charter v0.8.0

Work Charter now presents three user-facing work arrangements: Direct, Team, and Phased. Existing L0-L4 contracts remain valid. Direct preserves the separate L0, L1, and L2 internal rules; existing approved work is not migrated by this release.

  • Select an arrangement from the known goal, constraints, coordination, review, and recovery needs. Ordinary small work remains lightweight.
  • Review the actual Direct, Planner, Executor, or Orchestrator product against its applicable instructions and evidence. The original author repairs findings, and the same valid Reviewer rechecks them.
  • Allow approved continuing subagents, separate role tasks, or mixed carriers when permissions, continuity, user intervention, and result routing are reliable.
  • Update schema-v1 package defaults: Direct primary, Team Planner, and Phased Orchestrator use gpt-6-astra/high; Phased Planner and Executors use gpt-6-sol/xhigh; enabled independent Reviewers use gpt-6-astra/medium. Existing complete-object user overrides and frozen task settings retain precedence.
  • Fix the Standard workflow section link reported during the v0.7.1 review.

The source contract and repository provenance checks passed for this release candidate. These checks and independent source review do not establish natural agent adherence, live model routing, or runtime Skill reload. See docs/skills/work-charter/VERIFICATION.md for the exact evidence and limits.