Skip to content

Junction Quantum Hack 2026 — submission (frozen)

Latest

Choose a tag to compare

@kazulak kazulak released this 03 Oct 23:00
· 34 commits to main since this release

Frozen snapshot of team gate_crushers' submission to the IQM Quantum Error Correction challenge at Junction Quantum Hack 2026 (5–7 June 2026).

Everything on main after this tag is post-hackathon development and was not part of the submission.

What is frozen here

Item Reference
Submission code commit 16e86b1 ("final project"), pushed to GitHub 2026-06-07 06:42:31 UTC (server-side push log). It is the parent of the tagged commit.
This tag commit 3cfa714 (created 2026-06-08). Adds only the submission zip and slides on top of 16e86b1; the code is unchanged.
Submission archive gate_crushers_submission_20260607_085338.zip (attached). All 99 files that also exist in git are byte-identical to 16e86b1.
Slides Quantum_Hack_26_slides.pdf (attached; Quantum Hack 26.pdf in the tagged tree)
Hack-era IQM hardware job 019e9fa6-c559-77a0-821e-462fcebccfba (UUIDv7 timestamp 2026-06-07 03:16 CEST)

Verify

sha256sum -c SHA256SUMS.txt
git show 3cfa714:gate_crushers_submission_20260607_085338.zip | sha256sum

Credits

The pipeline was built on the challenge baseline provided by the organizers (Niklas Steinmann / Fraunhofer FOKUS; commits 5eae04f–6eeafb4).

Known issues found after the hackathon

A post-hackathon audit (October 2026) found issues that affect some numbers in this submission, most importantly an idle-noise scaling bug in the calibrated simulator. They are documented on main in ERRATA.md. This snapshot is intentionally left unchanged.