One sentence: the operational backbone gets provably reliable and provably accounted for — dispatched jobs finish their own git steps, a 5th zero-cost local agent joins the fleet, story routing gets real capability+quota+cost scoring with a fleet batch scheduler, and every dollar synlynk reports is now either structurally sourced or visibly flagged as an estimate.
Milestones
- Job Lifecycle Ground-Truth Verification (#126–#129) — dispatch worktree isolation, git-state-verified reconciliation, real
files_touched, fail-loud migration. - Dispatch git-finalization reliability chain (#182–#199) — synlynk finishes agents' git steps for them.
- Capability Matrix Hardening + Fleet Scheduler (epic #137) — 3-stage routing (capability → quota gate → cost tie-break) + unattended batch scheduler.
- Local Agent — a 5th dispatch agent running Aider over on-device oMLX inference, $0 per token.
- Measurement Ledger Hardening (epic #210) — every cost figure synlynk shows is now structurally sourced or visibly flagged as an estimate.
71 PRs merged since v0.11.0 (2026-07-05). Full details: CHANGELOG.md · Release blog post
🤖 Generated with Claude Code