You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
A resumed session is told when it began (ADR-0097). The system prompt
said "Session started: " while the conversation being
resumed began days before, and the model was seen taking the
conversation's older date for new work. A resumed session now reads Resumed: <day>; the conversation above began on <day>., and the runtime
states the same fact as its own message at the resume point — measured on a
resumed session, the system prompt alone left 0 of 5 runs dating new work
today, the note at the resume point 5 of 5. The date is also
captured once per session: a skills reload or MCP change after midnight
no longer moves it, and /clear captures a new one.
Documentation
Where an operator's procedures go (ADR-0096 §7): the integration
reference now says which routes arrive as instructions (instruction files,
skills) and which as data (every tool result, a knowledge-vault server's
notes included), so a procedure meant to be followed is written as a skill
rather than read from a vault; with the skill limits and why no path or
server can be made instruction-grade.