Skip to content

Conversation

@renovate
Copy link
Contributor

@renovate renovate bot commented Jan 9, 2025

This PR contains the following updates:

Package Type Update Change
astral-sh/ruff-pre-commit repository minor v0.8.6 -> v0.9.0

Note: The pre-commit manager in Renovate is not supported by the pre-commit maintainers or community. Please do not report any problems there, instead create a Discussion in the Renovate repository if you have any questions.


Release Notes

astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)

v0.9.0

Compare Source

See: https://github.com/astral-sh/ruff/releases/tag/0.9.0


Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@renovate renovate bot requested a review from a team as a code owner January 9, 2025 15:55
@renovate renovate bot added the renovate label Jan 9, 2025
gruebel
gruebel previously approved these changes Jan 9, 2025
@gruebel gruebel dismissed their stale review January 9, 2025 17:05

Didn't see the failed lints

@codecov
Copy link

codecov bot commented Jan 9, 2025

Codecov Report

All modified and coverable lines are covered by tests ✅

Project coverage is 94.39%. Comparing base (542d271) to head (7e04bb4).
Report is 1 commits behind head on main.

Additional details and impacted files
@@           Coverage Diff           @@
##             main     #149   +/-   ##
=======================================
  Coverage   94.39%   94.39%           
=======================================
  Files          14       14           
  Lines         749      749           
=======================================
  Hits          707      707           
  Misses         42       42           

☔ View full report in Codecov by Sentry.
📢 Have feedback on the report? Share it here.

Signed-off-by: gruebel <anton.gruebel@gmail.com>
@renovate
Copy link
Contributor Author

renovate bot commented Jan 10, 2025

Edited/Blocked Notification

Renovate will not automatically rebase this PR, because it does not recognize the last commit author and assumes somebody else may have edited the PR.

You can manually request rebase by checking the rebase/retry box above.

⚠️ Warning: custom changes will be lost.

@gruebel gruebel merged commit 24b11e1 into main Jan 17, 2025
24 of 25 checks passed
@gruebel gruebel deleted the renovate/astral-sh-ruff-pre-commit-0.x branch January 17, 2025 09:09
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants