Skip to content

Conversation

@renovate
Copy link
Contributor

@renovate renovate bot commented Mar 7, 2025

This PR contains the following updates:

Package Type Update Change
astral-sh/ruff-pre-commit repository patch v0.9.9 -> v0.9.10

Note: The pre-commit manager in Renovate is not supported by the pre-commit maintainers or community. Please do not report any problems there, instead create a Discussion in the Renovate repository if you have any questions.


Release Notes

astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)

v0.9.10

Compare Source

See: https://github.com/astral-sh/ruff/releases/tag/0.9.10


Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@renovate renovate bot requested a review from a team as a code owner March 7, 2025 18:53
@renovate renovate bot added the renovate label Mar 7, 2025
@codecov
Copy link

codecov bot commented Mar 7, 2025

Codecov Report

All modified and coverable lines are covered by tests ✅

Project coverage is 94.28%. Comparing base (f5c03a0) to head (97d26bc).
Report is 1 commits behind head on main.

Additional details and impacted files
@@           Coverage Diff           @@
##             main     #207   +/-   ##
=======================================
  Coverage   94.28%   94.28%           
=======================================
  Files          18       18           
  Lines         928      928           
=======================================
  Hits          875      875           
  Misses         53       53           

☔ View full report in Codecov by Sentry.
📢 Have feedback on the report? Share it here.

🚀 New features to boost your workflow:
  • Test Analytics: Detect flaky tests, report on failures, and find test suite problems.

@renovate renovate bot force-pushed the renovate/astral-sh-ruff-pre-commit-0.x branch from 99e729c to c7619a6 Compare March 7, 2025 21:40
@renovate renovate bot force-pushed the renovate/astral-sh-ruff-pre-commit-0.x branch from c7619a6 to 97d26bc Compare March 8, 2025 01:56
@renovate renovate bot merged commit 6495dc0 into main Mar 8, 2025
22 checks passed
@renovate renovate bot deleted the renovate/astral-sh-ruff-pre-commit-0.x branch March 8, 2025 06:49
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant