Skip to content

Move default components to an appropriate upgrade order (generic)#22690

Merged
openshift-merge-robot merged 1 commit intoopenshift:masterfrom
smarterclayton:upgrade_order
Apr 27, 2019
Merged

Move default components to an appropriate upgrade order (generic)#22690
openshift-merge-robot merged 1 commit intoopenshift:masterfrom
smarterclayton:upgrade_order

Conversation

@smarterclayton
Copy link
Copy Markdown
Contributor

Now that CVO only applies ordering on update, we are reorganizing
the order components are applied to better align with correct
upgrades. The order is:

0000_10_: config-operator
0000_20_
: kube-apiserver
0000_25_: kube scheduler and controller manager
0000_30_
: other apiservers: openshift and machine
0000_40_: reserved
0000_50_
: all non-order specific components
0000_60_: reserved
0000_70_
: disruptive node-level components: dns, sdn, multus
0000_80_: machine operators
0000_90_
: reserved for any post-machine updates

Operators in 0000_50_* should have no prefix (like 0000_70_
before). No other rules of ordering have changed.

Now that CVO only applies ordering on update, we are reorganizing
the order components are applied to better align with correct
upgrades. The order is:

0000_10_*: config-operator
0000_20_*: kube-apiserver
0000_25_*: kube scheduler and controller manager
0000_30_*: other apiservers: openshift and machine
0000_40_*: reserved
0000_50_*: all non-order specific components
0000_60_*: reserved
0000_70_*: disruptive node-level components: dns, sdn, multus
0000_80_*: machine operators
0000_90_*: reserved for any post-machine updates

Operators in 0000_50_* should have no prefix (like 0000_70_
before). No other rules of ordering have changed.
@openshift-ci-robot openshift-ci-robot added the size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. label Apr 27, 2019
@openshift-ci-robot
Copy link
Copy Markdown

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: smarterclayton

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci-robot openshift-ci-robot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Apr 27, 2019
@smarterclayton
Copy link
Copy Markdown
Contributor Author

/retest

@smarterclayton smarterclayton added the lgtm Indicates that a PR is ready to be merged. label Apr 27, 2019
@openshift-merge-robot openshift-merge-robot merged commit a1a3825 into openshift:master Apr 27, 2019
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants