Skip to content

openstack: Add missing credentials for ghira, bugwatcher#76697

Merged
openshift-merge-bot[bot] merged 2 commits into
openshift:mainfrom
shiftstack:fix-bugwatcher
Mar 23, 2026
Merged

openstack: Add missing credentials for ghira, bugwatcher#76697
openshift-merge-bot[bot] merged 2 commits into
openshift:mainfrom
shiftstack:fix-bugwatcher

Conversation

@stephenfin
Copy link
Copy Markdown
Contributor

No description provided.

Signed-off-by: Stephen Finucane <stephenfin@redhat.com>
Copy link
Copy Markdown
Member

@mandre mandre left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Thanks for the quickfix.
/lgtm
/approve

@openshift-ci openshift-ci Bot requested review from gryf and mandre March 23, 2026 14:47
@openshift-ci openshift-ci Bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Mar 23, 2026
@openshift-ci openshift-ci Bot added the lgtm Indicates that a PR is ready to be merged. label Mar 23, 2026
@stephenfin
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-shiftstack-ci-main-bugwatcher-pretriage periodic-ci-shiftstack-ci-main-bugwatcher-triage periodic-ci-shiftstack-ci-main-ghira periodic-ci-shiftstack-ci-main-bugwatcher-doctext periodic-ci-shiftstack-ci-main-bugwatcher-posttriage

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@stephenfin: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

Signed-off-by: Stephen Finucane <stephenfin@redhat.com>
@openshift-ci openshift-ci Bot removed the lgtm Indicates that a PR is ready to be merged. label Mar 23, 2026
@stephenfin
Copy link
Copy Markdown
Contributor Author

The periodic-ci-shiftstack-ci-main-bugwatcher-pretriage failure was expected: our service user does not currently have permissions to assign issues to users. The periodic-ci-shiftstack-ci-main-ghira failure was a valid bug though. Let's re-run.

/pj-rehearse periodic-ci-shiftstack-ci-main-ghira

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@stephenfin: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

[REHEARSALNOTIFIER]
@stephenfin: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
periodic-ci-shiftstack-ci-main-bugwatcher-pretriage N/A periodic Registry content changed
periodic-ci-shiftstack-ci-main-bugwatcher-triage N/A periodic Registry content changed
periodic-ci-shiftstack-ci-main-ghira N/A periodic Registry content changed
periodic-ci-shiftstack-ci-main-bugwatcher-doctext N/A periodic Registry content changed
periodic-ci-shiftstack-ci-main-bugwatcher-posttriage N/A periodic Registry content changed
Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci Bot commented Mar 23, 2026

@stephenfin: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/rehearse/periodic-ci-shiftstack-ci-main-bugwatcher-pretriage b3f2f89 link unknown /pj-rehearse periodic-ci-shiftstack-ci-main-bugwatcher-pretriage

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@eshulman2
Copy link
Copy Markdown
Member

/lgtm
/approve

@stephenfin
Copy link
Copy Markdown
Contributor Author

/pj-rehearse ack

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@stephenfin: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Mar 23, 2026
@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci Bot commented Mar 23, 2026

@eshulman2: changing LGTM is restricted to collaborators

Details

In response to this:

/lgtm
/approve

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@stephenfin
Copy link
Copy Markdown
Contributor Author

@eshulman2: changing LGTM is restricted to collaborators
Details

This is fixed here shiftstack/bugwatcher#111

@mandre
Copy link
Copy Markdown
Member

mandre commented Mar 23, 2026

/lgtm

@openshift-ci openshift-ci Bot added the lgtm Indicates that a PR is ready to be merged. label Mar 23, 2026
@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci Bot commented Mar 23, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: eshulman2, mandre, stephenfin

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-merge-bot openshift-merge-bot Bot merged commit c4033e4 into openshift:main Mar 23, 2026
10 checks passed
@openshift-merge-bot openshift-merge-bot Bot deleted the fix-bugwatcher branch March 23, 2026 19:25
BaiyangZhou pushed a commit to BaiyangZhou/release that referenced this pull request Mar 24, 2026
…6697)

* bugwatcher: Add missing secret mounts

Signed-off-by: Stephen Finucane <stephenfin@redhat.com>

* ghira: Add missing secret mounts

Signed-off-by: Stephen Finucane <stephenfin@redhat.com>

---------

Signed-off-by: Stephen Finucane <stephenfin@redhat.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants