Skip to content

Sync Boatstack from Intelligence Flow Labs @ c9e110ae06ef - #79

Merged
operator-stack-publisher[bot] merged 1 commit into
mainfrom
sync/intelligence-flow-c9e110ae06ef
Jul 23, 2026
Merged

Sync Boatstack from Intelligence Flow Labs @ c9e110ae06ef#79
operator-stack-publisher[bot] merged 1 commit into
mainfrom
sync/intelligence-flow-c9e110ae06ef

Conversation

@operator-stack-publisher

Copy link
Copy Markdown
Contributor

What this sync releases

Resolve managed-PR build lock across both feature layouts

Boatstack managed PR preparation no longer blocks the ship gate for features whose plan lock was written in the older feature-root layout. Previously managedPRSources looked for the task graph only at <feature>/compiled/tasks.json; a feature activated with tasks.json at the feature root (no compiled/ directory) failed the build-lock check with task_graph mismatch and reported "managed PR requires a current build lock" even after build, test, and review had passed.

The task graph is now resolved across both layouts through a single shared resolver that also backs evidence resolution, preferring each artifact's canonical location and falling back to the alternate. Features activated in either layout prepare their managed PR identically; no migration is required.

Projection provenance

Generated from operatorstack/intelligence-flow@c9e110ae06ef139d8ae336262558bc8bf21a1e2a.
Review provenance, tests, examples, and context-cost changes before merging.

@operator-stack-publisher
operator-stack-publisher Bot merged commit 3d17821 into main Jul 23, 2026
4 checks passed
@operator-stack-publisher
operator-stack-publisher Bot deleted the sync/intelligence-flow-c9e110ae06ef branch July 23, 2026 16:56
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants