Skip to content

eval(deltawire): integrate v5 infrastructure without raw evidence - #113

Merged
bigboateng merged 2 commits into
mainfrom
codex/deltawire-v5-integration
Jul 22, 2026
Merged

eval(deltawire): integrate v5 infrastructure without raw evidence#113
bigboateng merged 2 commits into
mainfrom
codex/deltawire-v5-integration

Conversation

@bigboateng

Copy link
Copy Markdown
Contributor

Summary

  • project the reusable Harbor collect-hook and deterministic environment receipt boundary from v5
  • add Git-object-backed v4/v5 evidence locks and compact terminal v5 classification
  • add no-model conformance validators and production-clean integration checks

Evidence boundary

PR #111 remains immutable experiment provenance. This PR excludes raw Harbor jobs, logs, trajectories, expanded output, the paid approval receipt, credentials, and VM-local absolute paths.

Validation

  • full DeltaWire Go validation, race suite, and 20x determinism suite
  • 12 canonical contracts and 96 mutation failures
  • v1-v5 Git-object evidence locks
  • environment and artifact-manifest receipt tests
  • production cleanliness and secret/path scans

READY_FOR_72=false.

@bigboateng
bigboateng merged commit 43c137d into main Jul 22, 2026
1 check passed
@bigboateng
bigboateng deleted the codex/deltawire-v5-integration branch July 22, 2026 16:14
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant