[5d2] fresh builders — definePage DSL decomposition (PLAN pending)#35
Conversation
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
…lders Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
|
@openhands-agent model=openrouter/moonshotai/kimi-k2.7-code output=pr-comment iterations=1000 use harness Activate SKILL
RE-DISPATCH — phase 1 of 2: RESEARCH ONLY. The previous run (trace Authority docs on this branch — read before anything else:
WRITE-EARLY CONTRACT (non-negotiable):
Scope of THIS run (research only):
Expected output: Hard rules: PLAN-phase research only — zero implementation; no lockfile changes; no Correction: a previous attempt of this run was cancelled by supervisor error ~15 min after start; ignore any CHAIN (agent-to-agent handoff, non-negotiable): If and ONLY if you finish successfully (research.md committed to this branch), END your summary file ( @openhands-agent model=openrouter/moonshotai/kimi-k2.7-code output=pr-comment iterations=800 use harness PHASE 2 of 2 — DESIGN + PLAN for [5d2 builders]. Authority docs on this branch: @openhands-agent model=openrouter/qwen/qwen3.7-max output=pr-comment iterations=400 use harness PLAN-EVAL (separate evaluator session) for [5d2 builders] per |
OpenHands Agent — CompletedModel: openrouter/moonshotai/kimi-k2.7-code OpenHands Run SummarySummaryThis run was the phase 1 RESEARCH ONLY pass for Wave 5d sub-gate 2/6: the Changes
Validation
Key private-type-ref surfaces observed:
Remaining risks / incomplete work
RESEARCH COMPLETE — READY FOR DESIGN TRIGGER @openhands-agent model=openrouter/moonshotai/kimi-k2.7-code output=pr-comment iterations=800 use harness PHASE 2 of 2 — DESIGN + PLAN for [5d2 builders]. Authority docs on this branch: @openhands-agent model=openrouter/qwen/qwen3.7-max output=pr-comment iterations=400 use harness PLAN-EVAL (separate evaluator session) for [5d2 builders] per Run: https://github.com/rickylabs/netscript/actions/runs/27446386333 |
|
@openhands-agent model=openrouter/moonshotai/kimi-k2.7-code output=pr-comment iterations=800 use harness PHASE 2 of 2 — DESIGN + PLAN for [5d2 builders]. Authority docs on this branch: .llm/tmp/run/feat-package-quality-wave5-apps--5d-fresh/handover-5d2-plan.md + BINDING umbrella plan.md in the same dir. REUSE the committed phase-1 research at .llm/tmp/run/feat-package-quality-wave5-apps--5d2-builders/research.md — do not re-derive it. Deliver design.md + plan.md + context-pack.md and update drift.md (entries D-5d2-n), committed to this branch per the handover's expected-output spec; plan.md MUST end with: Review map · Assumptions · Questions for supervisor · Dependencies & merge impact · Side-effect ledger. WRITE-EARLY CONTRACT: create skeleton files within your first ~15 actions, append incrementally, consolidate at ~60% budget. Hard rules: PLAN only — zero implementation; no lockfile changes; no deno cache --reload. |
OpenHands Agent — Agent failedModel: openrouter/moonshotai/kimi-k2.7-code OpenHands Agent Summary — INCOMPLETE (iteration limit)The agent hit the maximum iterations limit (800) before Re-trigger with a narrower task or a higher Run: https://github.com/rickylabs/netscript/actions/runs/27454169329 |
|
@openhands-agent model=openrouter/qwen/qwen3.7-max output=pr-comment iterations=400 use harness Activate SKILL
PLAN-EVAL — separate evaluator session for [5d2 definePage DSL decomposition]. The PLAN-phase generator (kimi k2.7) committed Evaluate against: Check: archetype + public-surface correctness; per-slice gates present and real; doc-lint / over-cap / private-type-ref budgets retired per slice; MEASURE-FIRST numbers internally consistent with the committed measurement artifacts; the required Output: commit |
OpenHands Agent — CompletedModel: openrouter/qwen/qwen3.7-max PLAN-EVAL Summary: 5d2 builders —
|
Independent evaluation identified 4 critical blockers: - No commit slices enumerated - 'One plan or two plans' decision unresolved - Fitness gate matrix not selected from archetype-gate-matrix.md - Required tail section (Review map/Assumptions/Questions/Dependencies/Side-effect ledger) missing Plus 7 significant gaps including incomplete design document (6/7 sections TODO), non-operationalized budgets, and missing form-package leak strategy. Second PLAN-EVAL cycle permitted per protocol. Co-authored-by: openhands <openhands@all-hands.dev>
|
@openhands-agent model=openrouter/moonshotai/kimi-k2.7-code output=pr-comment iterations=1000 use harness Activate SKILL
PLAN REVISION for [5d2 builders — definePage DSL decomposition]. Your prior PLAN was evaluated FAIL_PLAN by an independent evaluator. READ Blocking findings you MUST resolve (from the eval):
WRITE-EARLY: open design.md + plan.md immediately and append; the workflow auto-commits leftover files on budget cutoff. Stop exploring at ~60% budget; spend the rest writing the slice lock. Output: revised design.md + plan.md + updated drift.md committed to THIS branch; summary via |
OpenHands Agent — CompletedModel: openrouter/moonshotai/kimi-k2.7-code OpenHands Summary — 5d2 builders definePage DSL decomposition (PLAN revision)SummaryRevised the 5d2 plan artifacts after PLAN-EVAL returned Changes
Validation
Responses to PLAN-EVAL Findings
Remaining Risks
Artifact Commit Hash
READY FOR PLAN-EVAL Run: https://github.com/rickylabs/netscript/actions/runs/27462135694 |
- Lock one-plan decision (28 slices <= 30 cap). - Add actionable commit slice lock with files, gates, budgets. - Enumerate slow-type / JSR private-type-ref risks. - Complete design.md all 7 sections. - Add verdict/decision sections and required tail section to plan.md. - Append drift.md with D-5d2-1 (form-package visibility/JSDoc), D-5d2-2 (F-18 sub-barrel opt-outs), D-5d2-3 (slow-type opt-in pending). - Update context-pack.md and worklog.md to resume-ready state. Co-authored-by: openhands <openhands@all-hands.dev>
|
@openhands-agent model=openrouter/qwen/qwen3.7-max output=pr-comment iterations=400 use harness Activate SKILL
PLAN-EVAL — independent evaluator session for [5d2 builders — definePage DSL decomposition]. The PLAN generator committed a REVISED
ALSO check the standard plan-gate items: archetype + public-surface correctness; per-slice gates real and mapped to the archetype's REQUIRED gate set per Evaluate against Output: commit |
OpenHands Agent — CompletedModel: openrouter/qwen/qwen3.7-max PLAN-EVAL: 5d2 builders — definePage DSL decompositionEvaluator session: openhands (independent) SummaryEvaluated the revised plan for wave-5d sub-gate 2 ( VERDICT: PASS All 4 prior blockers resolved. Plan cleared for implementation. Blocker ResolutionBlocker 1: One-plan vs two decision — ✓ PASSL-6 locked "one plan, not two" with measurement-grounded rationale: 5 over-cap source files + 1 test file + 40 doc-lint errors fit in 27 slices (under 30 cap). Decision not deferred. Blocker 2: Actionable slice lock — ✓ PASS27 slices enumerated, each naming:
Slice sequence: surface snapshot → form leaks → builder/runtime/navigation decomposition → test splits → fixtures → validation. Blocker 3: Slow-type risk listing — ✓ PASSExplicit table at plan.md §156–164 names 5 symbols with:
Verdict: "only hard JSR blockers are the private-type-refs" — slow-type warnings handled by opt-in declaration. Blocker 4: design.md completeness — ✓ PASSAll 7 required sections present:
Standard Plan-Gate ItemsAll satisfied:
Advisory Findings (Non-Blocking)
ChangesEvaluation only — zero edits to plan/design/research. Artifacts Produced
ValidationProtocol compliance: Followed Artifacts reviewed:
Cross-checks:
Responses to Review CommentsPrior FAIL_PLAN verdict (4 blockers): All 4 blockers resolved in revised plan:
Generator claim: "All five blocking findings from PLAN-EVAL have been addressed" Evaluator confirmation: Confirmed. Plan also addressed protocol omissions (verdict/decision sections, gate set selection, tail section). Remaining RisksLow risk:
No remaining blockers. Plan is cleared for implementation. Run: https://github.com/rickylabs/netscript/actions/runs/27464673881 |
Slice 19 — Builder seam test splitFiles changed
Gates run
Commits
Push status
Drift
|
Slice 20 — Runtime/form seam test splitFiles changed
Gates run
Commits
Push status
Drift
|
Slice 21 — Navigation seam test splitFiles changed
Gates run
Commits
Push status
Drift
|
Slice 22 — Search/defer test split and monolith removalFiles changed
Gates run
Commits
Push status
Drift
|
Slice 23 — Package-local builder route fixturesFiles changed
Gates run
Commits
Push status
Drift
|
Slice 24 — Full builders test suiteFiles changed
Gates run
Commits
Push status
Drift
|
Slice 25 — Architecture fitness gatesFiles changed:
Gates run:
Commit hash:
Push status: pushed Drift: Added D-5d2-15. Root |
Slice 26 — Final doc-lint and publish dry-runFiles changed:
Gates run:
Commit hash:
Push status: pushed Drift: none new. Direct |
Slice 27 — Closeout artifactsFiles changed:
Gates run:
Commit hash:
Push status: pushed Drift: none new. Closeout handoff preserves D-5d2-15: root |
IMPL-EVAL — Wave 5d2 buildersVerdict: PASS — ready for supervisor merge. Evaluator note: The separate Codex app-server evaluator session could not start because the app-server account hit its usage limit. The supervisor ran the IMPL-EVAL gates directly from the native WSL ext4 worktree instead. Commit evaluated: Gates run from
Drift/debt accepted for merge: D-5d2-15 accurately records that root Not run by design: full scaffold runtime E2E ( |
Sub-gate 2/6 of Wave 5d. Scope:
./builders(definePageand the page pipeline) — the heaviest cluster (5 over-cap files: 1111/1098/712/667/575 lines). May split into two plans at the Plan Gate. PLAN phase opens with the supervisor handover prompt in the 5d umbrella run dir.🤖 Generated with Claude Code