[WAIFUS Phase 2] Validate cutover and rollback manifests #147

Description

@slashdevcorpse

Current control issue in slashdevcorpse/synara. During Phase 6, recreate any still-open phase tracker in slashdevcorpse/waifus and preserve this URL in the cutover map.

Owner: slashdevcorpse
Source plan: docs/plans/waifus-rebrand-and-repository-independence.md
Approved plan SHA-256: B3D07F514F3E7D90C3EC4A8C586CD34E145D1673ED661B8D76D52F278AEC336A

Goal

Restore both backups, validate every cutover and rollback record, and reconfirm the standalone-public-repository plus archived-ledger architecture before repository creation.

Gates and dependencies

  • Blocked by: Phase 1
  • Gate coverage: Phase 1; D-3/D-4; schema-valid cutover map and public-reference inventory.
  • Exit gate: Backups restore, every manifest entry is classified, rollback is documented, and no detachment has occurred.

Tracking

  • Dependency and gate inputs are verified.
  • Every requirement in the collapsed goal.md is complete.
  • Required evidence is linked in this issue.
  • STOP conditions are clear.
  • Exit gate is independently verified.

Outputs

  • Independent restore and SHA/ref/release comparison reports.
  • Validated migration evidence with every FR-23 class classified.
  • Executable rollback runbook and recorded D-3/D-4 reconfirmation.

PR structure

GitHub native Stacked PRs is private preview and is not a dependency. Do not combine this phase with an adjacent phase and do not use an atomic multi-PR stack merge. No bootstrap or implementation PR begins until this issue exits.

goal.md

Phase 2 — Validate cutover and rollback manifests

Objective

Restore both backups, validate every cutover and rollback record, and reconfirm the standalone-public-repository plus archived-ledger architecture before repository creation.

Source of truth

  • Plan path: docs/plans/waifus-rebrand-and-repository-independence.md
  • Approved SHA-256: B3D07F514F3E7D90C3EC4A8C586CD34E145D1673ED661B8D76D52F278AEC336A
  • Owner: slashdevcorpse
  • Applicable gate coverage: Phase 1; D-3/D-4; schema-valid cutover map and public-reference inventory.
  • If this embedded goal conflicts with the approved plan, stop and resolve the conflict before mutation.

Prerequisites

  • The native blocked-by dependency above is complete.
  • Applicable provisioning, identity, governance, release, and migration gates are verified at the exact current state.
  • Required mutation authority exists before any external write.
  • No later phase is pulled forward.

Requirements

  • Restore a sample from both Git backups and compare the source-freeze SHA,
    branches, tags, and release hashes.
  • Review every FR-23 inventory class and both versioned migration evidence
    files for unclassified or schema-invalid entries.
  • Verify the rollback procedure can restore legacy repository visibility,
    homepage/support routing, historical domain disposition, and release
    withholding without deleting history. No new WAIFUS DNS is provisioned.
  • Reconfirm D-3 and D-4: create a new standalone repository and preserve the
    legacy fork as an archive. GitHub's self-service detachment MUST NOT be used.

Any later GitHub Support proposal for an in-place architecture change reopens
D-3 and D-4 and requires a revised, re-approved plan before any action.

Required outputs

  • Independent restore and SHA/ref/release comparison reports.
  • Validated migration evidence with every FR-23 class classified.
  • Executable rollback runbook and recorded D-3/D-4 reconfirmation.

Verification

  • Both backups restore and all frozen object IDs/hashes match.
  • Both migration evidence files are schema-valid with zero unclassified entries.
  • No fork detachment or WAIFUS DNS provisioning occurred.

Exit criteria

Backups restore, every manifest entry is classified, rollback is documented, and no detachment has occurred.

Non-goals

  • Creating or pushing the canonical repository.
  • Detaching or deleting the legacy repository.
  • Implementing branding, publication, DNS, or tracker migration.

STOP conditions

  • Either backup or rollback cannot be proven.
  • Any manifest entry is invalid or unclassified.
  • Detachment, history rewrite, or custom-domain scope is introduced without a revised approval.
  • The exact current PR head, base, checks, review, DCO, provenance, or owner authorization is stale or incomplete where a PR is required.
  • Work would expand beyond this phase or contradict the approved plan.

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or request

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions