Repository navigation
Panel Tour
The Red Team panel is a per-session DSH sidebar tab: each chat session has its own engagement, graph and audit tail. Open it from +, or let the agent start an engagement and it opens itself.
-
Header — engagement name, mode badge (
SAFE/DEFAULT), engagement id (RT-YYYYMMDD-XXXX) and the EN / RU toggle. - Status line — client and scope summary, RoE state, shortened session id, current phase and the progress percentage over a thin bar.
-
Action row — the drawer buttons and the mode button (
SAFEwhen DEFAULT is active,DEFAULTwhen SAFE is active). Switching to DEFAULT requires an accepted RoE; switching to SAFE does not. - Banner — the current constraint: SAFE mode active, acceptance required, or a degraded runtime.
- Phase rail — the nine PTES phases with status and timer, Set done for the running phase, and Show all phases below 820 px.
- Tab strip and body — eight tabs with counts, each body inside an error boundary. Light and dark follow Host theme tokens; layouts are checked at 820 px and 430 px.
The graph is the engagement: Goal → Intent → Fact → Finding → Asset, with labeled edges, zoom, fit,
legend and a phase filter. Click a node for the inspector: detail, references, the tool run behind it
and the edges in and out.

One row per invocation: command, target, category, runtime, exit code, duration and output excerpt. A kill control stops a runaway run; blocked, denied and expired runs appear here too.
A sortable table: title, severity, CVSS, CWE, OWASP, WSTG, asset and status (unverified, verified,
exploited or reported). Selecting a finding shows its evidence and remediation.
A target-topology map of targets, assets, services, findings and their edges (pan, zoom, fit, keyboard focus), followed by the asset list: hosts, URLs, services, accounts, cloud resources, data stores and LLM endpoints, with metadata.
The read-only intelligence board: one row per IP, CIDR, domain or hostname with identity fields (ASN, country, ISP/organization, reverse DNS), reputation and blacklist signals, the sources that answered with timestamps, graph connections and a confidence indicator. A kind filter switches between All/IP/CIDR/Domain/Hostname. Nothing is invented: a field no source returned stays absent, and an engagement with no OSINT data shows the empty state and the next action (run a lookup or configure a service). The OSINT report action writes the standalone Markdown/HTML/JSON deliverable. Lookups themselves are started from the OSINT drawer, not here.
Markdown, self-contained HTML (embedded screenshots), JSON, PDF, DOCX (Word TOC, headers/footers,
evidence images) and a slide outline, in English or Russian. A report generated before closure is a
draft; the final set comes from pentest_complete_engagement, and Export bundle (ZIP) packs the
reports, evidence, findings and state with a manifest and SHA-256 sums.

The delegation board: the plan objective and steps, maxParallel, role list, status-grouped task
cards (owner, focus agents, priority, dependencies, write scopes and budgets), the independent
critic verdict with its checks, and task actions — update, focus, reassign, hand off (with a note), mark done.
Plan team fills an empty board; select a task to copy or download its complete native
subagent prompt. When DSH Agent Teams is enabled, publishing creates the matching native tasks in
dependency order.
The bounded tail of the trail, newest last; the full trail stays in $DSH_HOME/redteam/audit/.
Targets, CIDRs, domains and exclusions, plus the RoE form: client/owner, emergency contact, rules and constraints and the confirmation box. Accept and start records acceptance and unlocks gated phases. Build scope with AI (optional) drafts names, targets, CIDRs, domains and exclusions from one description; review the fields, then save — nothing is applied automatically.
Scope proposals lists what the agent discovered and asked to add: the target, proposed/
applied/rejected status, the matched root (or the reason it missed), the discovering fact and
evidence ids, confidence and time. In-root expansions are already applied; everything else waits
for Approve/Reject. Exclusions and metadata endpoints are never expandable.
Stop and Restart from scratch close or reset the engagement: Stop kills runs, interrupts
tracked agents, blocks the running phase and denies pending approvals while keeping findings and
evidence; Restart archives the previous state under $DSH_HOME/redteam/archives/ and starts a clean
engagement with the same scope, client and RoE.

Runtime badge (DOCKER, HOST, UNAVAILABLE), the curated catalog, install and remove, package
search and Set up Kali container.

Bundled lists per category, .txt uploads (32 MB cap), previews, and the AI panel: base list or
category, candidate count, instruction and a consent tick. Hit and miss feedback, recorded per list, joins the next prompt once consent is given.

39 services with configured state, key source, quota where reported and last error. A key set
here goes through the credential service when available and is never displayed again. Lookups run
from here; the OSINT tab is where the collected results are read. Passive enrichment is started by
the agent (pentest_osint_enrich) and lands in the same tab.

Chromium sessions: live URL and title, last action, action log, screenshot preview, network and
console counters and Close session. The agent launches a session; you observe and close it. The
HTTP assessment (pentest_web_assess) is recorded as a fact plus JSON evidence, so its headers,
cookies, forms, technology hints and exposure probes are read in the Flow inspector and the Evidence
drawer rather than in this drawer.

A base URL and Discover endpoints, OpenAPI and GraphQL cards, and the inventory with method, path, source, status and auth marker; fuzzing picks a payload category, location, rate and cap.

Filters for all, screenshots, HTTP, tool output, data and notes; per record title, kind, target, time, size, SHA-256, linked finding and download. Add note records an observation not produced by a tool.

One card per pending request: tool, exact command, target, phase, category, rationale and expected impact, with Approve once, Approve for phase and Deny. Cards expire after five minutes.

- Agent tools — the tools behind each tab and drawer
- Engagement and graph — what the Flow tab renders
- OSINT — the OSINT tab and drawer
- Web and API testing — the Web test and API test drawers
- Team and planning — the Team tab
- User guide
- Field manual: understanding the panel
dsh-redteam is MIT licensed. Use it only against systems you are authorized to test. — Report a vulnerability · Issues
dsh-redteam
Start here
Reference
- Agent tools
- Configuration
- Kali toolbox
- Wordlists
- OSINT
- Web and API testing
- Exploitation loop
- Team and planning
- Evidence and reports
- Scope and safety
- Resources
- Architecture
Operations
Project