Skip to content

Peer Review - Potential Hazard Suggestion #187

@cyrussamante

Description

@cyrussamante

Artifact Under Review
Hazard Analysis

Team Number for Team Doing the Review
Team 03

Description of Issue

I'm not too sure as to how this optimizer will work but if suitable, a potential hazard could be the following. What would happen if the system completing the optimization shuts down or fails while in operation? This could result in some lost code changes and create significant delays in the optimization as a whole. Just a suggestion :)

Metadata

Metadata

Assignees

Labels

hazard-analysisRelated to the Hazard Analysis (Deliverable 3)peer-reviewFeedback from peers

Type

No type

Projects

Status

Done

Relationships

None yet

Development

No branches or pull requests

Issue actions