Skip to content

[DELIVERABLE 5] Design #287

@Sevhena

Description

@Sevhena

Group Tasks

We will most likely need to sit down over a meeting and hash this out together, then we can split the modules up.

Priority Tasks

Behaviour Hiding Modules

Module Decomposition and MIS

Refactorers

Software Decision Modules

Module Decomposition and MIS

Task That Depend on Tasks Above

Notes about other sections to be completed

  • Any abbreviations or acronyms need to be listed (for both docs)
  • All images need to be wrapped in a figure environment and all tables (longtable, tabular, tabularx) need to be wrapped in a table environment. This is so the list of tables and figures works properly (last 2 sections in doc). Also be sure to put a caption and label and properly references your figures and tables
  • In the MIS doc, make note of any notation used in the table at the beginning
  • In the MIS doc, the module decomposition section is just copying from the MG doc. Everyone is responsible for copying over their module.

Other Notes

  • There is a question mark next to the MG introduction because it is already filled out I am not sure if we need to re-write it
  • This MIS is in the other doc

Sub-issues

Metadata

Metadata

Labels

designRelated to the Design Documents (Deliverable 5)documentationImprovements or additions to documentation

Type

No type

Projects

Status

Done

Relationships

None yet

Development

No branches or pull requests

Issue actions