Repository navigation
ADR 0025
github-actions[bot] edited this page Nov 19, 2026
·
2 revisions
ADR-0025: Generate the 29119-3 test report + ISO 10007 status accounting from the verification apparatus
- Status: Accepted
- Date: 2026-08-02
- Deciders: standards audit (2026-08) via
repo-standards-reviewv0.2.19 (deeper clause-level pass) - Relates to: LBA-REQ-035, ADR-0013 (enforced 42010 correspondence graph), ADR-0024 (govern 26514 information for users)
The coarse five-lens audit scored the repo 25/25, so a deeper, clause-level pass
was run against repo-standards-review's per-standard clause research. It found
subtler gaps the rubric could not see. Two are concrete and adjacent:
-
ISO/IEC/IEEE 29119-3 (test documentation): the repo keeps a test plan
(
docs/testing/test-plan.md, the design of what to test) but no test report — the executed outcomes. The apparatus runs (130+ fail-closed gates, a correspondence graph, a coverage gate) but nothing recorded the result as a governed information item. - ISO 10007 / ISO/IEC/IEEE 12207 (configuration status accounting): the CM plan describes status accounting, but no artifact records the controlled state of the configuration items (requirements by status, ADRs, gates, test items).
A hand-written report or status log would immediately drift from the apparatus it claims to describe — the same failure mode the 26514 audit finding (ADR-0024) flagged for user information.
-
Generate the report, do not hand-write it.
experiments/reqs-coverage/generate-test-report.mjsderives, from the canonical committed sources, intodocs/testing/test-report.md:- the 29119-2 completion criteria (a change is complete when every governed gate passes fail-closed on both platforms; no manual override);
- the 29119-3 executed verification evidence (the full fail-closed gate inventory, the correspondence rules, the coverage floors, the extension suites);
- the ISO 10007 configuration status accounting (requirements by status, ADRs, gates, correspondence rules, and test items — the controlled state).
-
Make it deterministic (no timestamps, no git HEAD) so
--checkis a stable drift gate, mirroring the generated traceability matrix (ADR-0013 Stage 3). -
Gate it fail-closed.
test-report-currentruns the self-test, which proves the committed report is current, that rendering is deterministic, and that the drift compare fails closed on any mutation. - Register it (15289) in the information item map and the correspondence graph.
This is requirement LBA-REQ-035.
- The repo now carries the two information items that a deeper clause audit expects (a test report, not only a test plan; a status-accounting record, not only a CM plan) — and they cannot silently lag the apparatus, because a drift fails the build.
- The report and the traceability matrix become the two generated, drift-gated views of the same correspondence graph: what is verified and how it traces.
- Assurance is corroborated by construction: the executed-evidence and status-accounting record are re-derived on every change rather than trusted.
Generated from docs/architecture/adr/ADR-0025-generated-test-report-status-accounting.md on develop. Edit the source in the repository, not this page.