Repository navigation
ADR 0026
- Status: Accepted
- Date: 2026-08-02
- Deciders: standards audit (2026-08) via
repo-standards-reviewv0.2.19 (deeper clause-level pass) - Relates to: LBA-REQ-036, ADR-0025 (generated test report + status accounting), ADR-0022 (transparency log + verify-before-install), ADR-0016 (provenance/attestation), ADR-0010 (GitFlow)
The deeper clause-level audit checked the repo against ISO/IEC/IEEE 15289's
distinction between a plan and a procedure. The repo had a configuration
management plan (docs/cm/cm-plan.md) and a 12207 move/transition
procedure, but no release procedure — the step-by-step execution of a
signed, corroborated release. The actual release flow existed and was enforced,
but only as scattered fragments: branch governance in the CM plan, the
bidirectional agreement gate (LBA-REQ-020), keyless attestation (LBA-REQ-025),
the transparency log and verify-before-install (LBA-REQ-031). A new releaser had
no single procedure to follow, and any prose procedure would drift the moment a
workflow was renamed.
-
Author the release procedure as a first-class 15289 information item
(
docs/release/release-procedure.md): release branch → version bump →--no-ffmerge tomain→ corroboration quorum → bidirectional WIN ↔ LINUX agreement → keyless signing (cosign / Fulcio / public rekor) → transparency-log inclusion → immutable GitHub Release → verify-before-install → merge back. - Ground every step in the real enforcement point — the actual workflow, script, gate, or requirement that enforces it — so the procedure documents the apparatus rather than an aspiration.
-
Gate it fail-closed.
experiments/release/verify-release-procedure.mjsasserts that every workflow / script / action path the procedure cites resolves on disk, and that the procedure names every required release invariant; wired asrelease-procedure-references-resolvewith a self-test that also proves a missing cited file or a dropped invariant is rejected. - Register it (15289) in the information item map and the correspondence graph.
This is requirement LBA-REQ-036.
- The release process is now a single, followable, resolvable procedure — not tribal knowledge scattered across the CM plan and grid requirements.
- The procedure cannot silently rot: renaming or deleting a cited release workflow or script fails the build until the procedure is updated, the same current-by-construction guarantee the generated test report (ADR-0025) and the 26514 information set (ADR-0024) already enjoy.
- The 15289 procedure/report gap the deeper audit found is closed: the repo now carries a release procedure (execution) alongside its CM plan (policy) and its generated test report (outcomes).
Generated from docs/architecture/adr/ADR-0026-release-procedure-information-item.md on develop. Edit the source in the repository, not this page.