Skip to content

Definition Of Done

github-actions[bot] edited this page Nov 19, 2026 · 2 revisions

Definition of Done (DoD Gate / dod)

This document is the Definition of Done for labview-benchmark-actor: the objective, re-runnable conditions a change must satisfy before it is considered releasable. It is the release-readiness contract enforced by the DoD Gate / dod status context (.github/workflows/dod.yml) and self-certified by the dependency-free local gate suite (experiments/verify-local-gates.mjs, check dod-definition-present).

Nothing in this file reproduces standards text. Standards are referenced by identifier and clause/topic only; the source PDFs are licensed and kept local (never committed).

Standards basis (reference only)

The Definition of Done is derived from, and traceable to, these information sources:

  • ISO/IEC/IEEE 29119-2:2021 — test planning defines scope, entry criteria, and exit / completion criteria, with evidence retained for completion (Clause 7 dynamic test processes; test completion criteria, §3.2). Our "Verification" and "Evidence" exit items below implement this.
  • ISO/IEC/IEEE 29148:2018 — requirements traceability (RTM linking requirements to verification, §3.1.23–3.1.24). Our "Traceability" exit item implements this.
  • ISO/IEC/IEEE 12207:2017 — software life-cycle process outcomes must be achieved and evidenced before a work product is complete. Our exit criteria are the per-change outcomes.
  • ISO/IEC/IEEE 15289:2019 — required life-cycle information items (the SRS, RTM, architecture, CM plan, test plan, user guide) are present and current.
  • ISO 10007:2017 — configuration management: baselines and status accounting (GitFlow governance, ADRs, the CM plan). Our "Configuration" exit item implements this.
  • ISO/IEC/IEEE 42010:2022 — an architecture description exists and is current. Our "Architecture" exit item implements this.

Entry criteria

A change may enter the release-readiness check when:

  1. It targets develop (feature branches) or main (release) per GitFlow (ADR-0010, CM plan).
  2. It is scoped to a requirement or ADR, or is an explicitly-scoped experiment under experiments/**.
  3. It builds locally (npm ci where applicable) with no new lint/type errors it introduces.

Exit criteria (the Definition of Done checklist)

A change is Done only when every applicable item below is satisfied. Each item maps to a concrete, machine-checkable gate or retained artifact — this is what makes the DoD objective rather than aspirational.

# DoD condition Standards ref Enforced by
1 Verification — the authoritative local gate suite is green (all check(...) pass). 29119-2 (exit criteria); 12207 (outcomes) node experiments/verify-local-gates.mjs (this DoD Gate runs it)
2 Test coverage — the committed Cobertura artifact meets the parametrized floor. 29119-2/3 coverage-artifact-meets-floor + PR Coverage Gate / coverage
3 Traceability — every requirement resolves to a CodeRef and a TestID; the RTM is consistent. 29148 (traceability) reqs-coverage gate; docs/requirements/rtm.csv
4 Configuration — GitFlow branch governance is honored; ADRs record significant decisions; the CM plan is current. 10007 (baselines / status accounting) gitflow-branch-governance-documented; docs/cm/cm-plan.md; docs/architecture/adr/**
5 Architecture — the architecture description reflects the change. 42010 docs/architecture/overview.md
6 Information items — the required life-cycle documents remain present and current. 15289 docs/requirements/srs.md, rtm.csv, docs/testing/test-plan.md, user guide
7 Evidence — the change retains re-runnable proof (experiment receipts / self-tests), not prose claims. 29119-2 (retained completion evidence) committed receipts under experiments/**; verify-local-gates receipt

Enforcement

  • DoD Gate / dod (.github/workflows/dod.yml) publishes the status context and fails the change if the local gate suite is not green — i.e., if any exit criterion above is unmet.
  • The pull-request template (.github/pull_request_template.md) lists the exit criteria as a checklist that every pull request carries before merge.
  • experiments/verify-local-gates.mjs check dod-definition-present statically verifies that this document exists, carries the DoD Gate / dod marker, enumerates entry/exit criteria, and is wired to the DoD Gate workflow. It also verifies that the pull-request template's checklist names exactly these exit criteria, in order. So the Definition of Done cannot silently drift or disappear.

A change that satisfies every applicable exit criterion above has met the DoD Gate / dod and is releasable.


Generated from docs/dod/definition-of-done.md on develop. Edit the source in the repository, not this page.

Clone this wiki locally