Repository navigation
2.1.3
What's Changed
- Do not clamp EMMA maximum feed grid power to one inverter rated power by @alinclaudiu in #1404
- Use configuration timeout for configuration coordinators by @Optic00 in #1409
- Use new SerialPortSelector in config flow
- Allow baud rate to be configured
- Allow setup to complete when optimizer data is not available (#1408)
Full Changelog: 2.1.2...2.1.3