candidate generation
This document explains how candidate plans are generated, how assumptions drive the candidate set, and the mathematical models behind each strategy.
- Why multiple candidates?
- Candidate list
- Assumptions behind each candidate
- Partial-SoC candidates (BatPred-inspired)
- MILP global optimisation
- Candidate deduplication
- Hysteresis
Battery scheduling is a sequential decision problem under uncertainty (prices, PV, and load are forecasts, not certainties). A single heuristic strategy may miss the global optimum under certain market conditions. By evaluating multiple independent strategies and picking the cheapest valid one, the planner:
- Captures more of the available arbitrage value
- Degrades gracefully when forecasts are wrong
- Provides explainable alternative plans for debugging
The generator (planner/candidate_generator.py) produces these candidates:
| # | Name | Strategy |
|---|---|---|
| 1 | baseline |
Current HSEM scheduling output (discharge → charge → excess export → optimisation) |
| 2 | no_action |
Battery completely idle — no forced charge or discharge |
| 3 | passive |
Solar charging only where PV surplus exists; no grid charge or forced discharge |
| 4 | grid_charge |
Grid-charge slots kept; solar charging removed |
| 5 | solar_only |
Only solar-charge slots kept; grid charging cleared |
| 6 | discharge_only |
Discharge slots kept; all charge slots cleared |
| 7 | aggressive |
Cheapest N slots forced to grid-charge; most expensive M slots forced to discharge |
| 8 | milp |
Globally-optimal LP solution (when scipy is available) |
| 9–14 | soc_plan_25/50/75/100/125/full |
Partial-SoC candidates charging different fractions of discharge-window need |
Assumption: The inverter can be left in its default self-consumption mode (no external scheduling). PV surplus is exported; battery only moves according to its native operating logic.
Purpose: Provides a baseline cost that all other candidates must beat.
If no candidate beats no_action, the planner falls back to doing nothing.
Mathematical model:
- All recommendations cleared to
None - No grid charge, no forced discharge, no force export
- SoC simulation still runs: PV charges battery if native logic would do so
- Terminal SoC is still accounted for
Assumption: The inverter's default behaviour is solar-following — it charges from PV surplus when available and stays idle otherwise. No grid price arbitrage.
Purpose: Models what happens if HSEM only sets PV-charge recommendations without any grid-based scheduling.
Mathematical model:
- Solar surplus slots (where
estimated_net_consumption < 0) getbatteries_charge_solar - All other charge/discharge/export recommendations cleared
- Battery fills from PV, never from grid
- Battery never discharges unless native inverter logic does so
Assumption: Buying grid energy at a low price, storing it, and using it during a high-price period is profitable after accounting for round-trip losses, cycle cost, and the minimum price spread.
Purpose: Tests whether the price spread available in the horizon justifies the round-trip cost of grid charging.
Mathematical model:
- Grid-charge slots kept from the scheduler's output
- Solar charging cleared
- Discharge slots kept (to recover the stored energy)
- Effectively: "charge from grid when cheap, discharge when expensive, ignore solar charging"
Assumption: Solar energy is always cheaper than any grid import, and the battery should prioritise storing PV surplus over grid charging.
Purpose: Tests whether PV surplus alone can satisfy the discharge-window demand without incurring grid-import costs.
Mathematical model:
- Solar-charge slots kept
- Grid charging cleared
- Discharge slots kept when needed
- Effectively: "store every kWh of PV surplus, use it during expensive slots"
Assumption: The battery has enough stored energy from previous cycles to cover the discharge demand without any additional charging within the horizon.
Purpose: Tests whether the existing SoC is sufficient to ride through the horizon without recharging.
Mathematical model:
- Discharge slots kept
- All charge slots cleared
- Battery only discharges, never charges
- Useful when SoC is high and horizon is short
Assumption: The most extreme price spread in the horizon should be fully exploited by charging at the cheapest N slots and discharging at the most expensive M slots, ignoring schedules.
Purpose: Upper-bound test — what is the maximum arbitrage value if we ignore schedule constraints?
Mathematical model:
- N dynamically computed from battery headroom:
N = ceil(usable_headroom_kwh / max_charge_per_slot) - M dynamically computed from usable energy:
M = ceil(current_kwh_above_floor / max_discharge_per_slot) - N cheapest import slots set to
batteries_charge_grid - M most expensive import slots set to
batteries_discharge_mode - Scales with horizon length and battery capacity (fix for issue #416 Bug 2)
Introduced as a BatPred-inspired improvement (issue #445 fix), partial-SoC candidates charge different fractions of the energy needed for upcoming discharge windows. This lets the selector find the optimal charge level — charging exactly what's needed, not filling to 100 % every time.
| Candidate | Fraction | Meaning |
|---|---|---|
soc_plan_25 |
0.25 | Charge 25 % of the discharge-window need |
soc_plan_50 |
0.50 | Charge 50 % |
soc_plan_75 |
0.75 | Charge 75 % |
soc_plan_100 |
1.00 | Charge exactly what's needed |
soc_plan_125 |
1.25 | Charge 125 % (safety margin) |
soc_plan_full |
2.00 | Fill to maximum usable capacity |
energy_needed = sum(
discharge_energy for each discharge window in the horizon
) - current_kwh_above_floor
charge_target = energy_needed * fractionPartial charging avoids the cycle-cost overhead of filling the battery completely when the discharge demand is small. Consider:
- Discharge window needs 3 kWh
- Battery is at 50 % of 10 kWh usable (5 kWh above floor)
- Full charge (soc_plan_full) would charge 5 more kWh, incurring 5 kWh × cycle_cost
- soc_plan_100 charges exactly 0 kWh (already have enough)
- soc_plan_25 / 50 / 75 may be suboptimal here because existing SoC already exceeds the need — the candidates converge to the same plan
When SoC is low and discharge need is large, partial-SoC candidates let the selector find the precise charge level that minimises the sum of import cost and cycle cost.
- Discharge-window energy can be predicted from schedule configuration
- Cycle cost is proportional to throughput
- The optimal charge level is somewhere between 25 % and 100 % of the discharge-window need (not necessarily full)
The MILP solver (planner/milp_optimizer.py) uses scipy's HiGHS to find the
globally optimal charge/discharge schedule.
6 × n variables for n slots:
| Index range | Variable | Meaning |
|---|---|---|
[0..n-1] |
ec[t] |
Energy charged in slot t (kWh) |
[n..2n-1] |
ed[t] |
Energy discharged in slot t (kWh) |
[2n..3n-1] |
gi[t] |
Grid import in slot t (kWh) |
[3n..4n-1] |
ge[t] |
Grid export in slot t (kWh) |
[4n..5n-1] |
pv[t] |
PV surplus used in slot t (kWh) |
[5n..6n-1] |
m[t] |
max(ec[t], ed[t]) auxiliary for cycle cost |
Where:
-
$\alpha$ = battery cycle cost per kWh -
$\gamma$ = terminal-SoC replacement price -
m[t] ≥ ec[t]andm[t] ≥ ed[t](max constraint)
For each slot t:
-
SoC forward recurrence:
$soc[t] = soc[t-1] + ec[t] - ed[t]$ -
SoC bounds:
$0 \leq soc[t] \leq usable_{kwh}$ -
Charge limit:
$ec[t] \leq max_charge_per_slot$ -
Discharge limit:
$ed[t] \leq max_discharge_per_slot$ -
Mutual exclusion:
$ec[t] / max_charge + ed[t] / max_discharge \leq 1$ -
Energy balance:
$gi[t] + pv[t] + ed[t] \cdot \eta_{dis} = load[t] + ec[t] / \eta_{chg} + ge[t]$ - Non-negativity: All variables ≥ 0
- Linear relaxation: Binary charge/discharge flags are relaxed to continuous because the mutual-exclusion constraint and per-slot caps already prevent simultaneous charge+discharge in the optimal solution.
- Deterministic inputs: All forecasts (prices, PV, load) are treated as known with certainty (no stochastic programming).
-
Cycle cost proxy: The
m[t] = max(ec[t], ed[t])formulation counts the larger of charge or discharge per slot, matching the 2× denominator in the cycle cost formula.
If scipy is unavailable or the solver fails (infeasible / numerical issue),
the MILP candidate is silently dropped and the rule-based candidates compete
as normal.
When generating partial-SoC candidates, targets within 0.05 kWh of each other are deduplicated to prevent near-identical plans from polluting the candidate list:
DUPLICATE_THRESHOLD_KWH = 0.05
filtered = [targets[0]]
for t in sorted(targets)[1:]:
if t - filtered[-1] >= DUPLICATE_THRESHOLD_KWH:
filtered.append(t)This is especially important when current_kwh is low and all partial-SoC
fractions collapse to the same charge target.
Prevents the planner from switching strategies for tiny cost improvements. When active:
- The previously active plan is re-evaluated with current data
- If its score improvement over the best new candidate is below both thresholds, the previous plan is kept
| Threshold | Default | Behaviour |
|---|---|---|
| Absolute | 0.0 currency | New plan must be cheaper by at least this amount |
| Percentage | 5.0 % | New plan must be cheaper by at least this % of previous score |
Prevents rapid charge↔discharge toggles near schedule-window boundaries.
-
Charge-type:
batteries_charge_grid,batteries_charge_solar,ev_smart_charging -
Discharge-type:
batteries_discharge_mode,force_batteries_discharge,force_export -
Neutral:
batteries_wait_mode,time_passed,missing_input_entities,None
Only cross-category transitions are held. The hold time is configured by
planner_window_hysteresis_minutes (default: 0, disabled).
- Home — User-facing overview: features, FAQ, working modes, battery schedules, excess export, consumption sensors
- Battery Charging Economics — How to calculate the minimum charging price for a battery schedule
- Architecture Overview — System context, layered architecture, module map, planning pipeline
- Planner Specification — Normative — all planner invariants, rules, and constraints
- Planner Technical Guide — How the planner works with worked examples
- Cost Function Math — Complete mathematical formulation of the 8-term cost function
- Energy Accounting — Physical energy flow model, SoC simulation, efficiency math
- Candidate Generation — How candidates are generated, assumptions, partial-SoC
- MILP Optimization — Full LP formulation, variable layout, constraints, and solver pipeline
- Consumption Prediction — Weighted-average model, IQR outlier detection, spike suppression
- Safety Modes — Degraded mode, read-only gate, write-verify applier, runtime resolver
- Price Scaling — EDS price scaling, eds_share conversion factor
- Services Reference — All 4 HSEM services with examples
- Sensors Reference — Complete entity reference: all sensor, select, switch, number, and time entities
- Dashboard Setup — Step-by-step ApexCharts dashboard with full YAML, layout reference, and troubleshooting
- Config Flow Reference — Every config/options flow step and field
- EV Charge Plan Setup — EV planned load configuration guide
- EV Surplus Charging Automation — Wire your physical EV charger (go-e, Easee, Zaptec) to follow HSEM surplus recommendations
- EV Optimal Charging Template — Legacy Home Assistant template sensor for cost-optimal EV charging
- Forecast Accuracy Tracking — Forecast vs actual tracking system
- Huawei Entities — Canonical HA entity ID reference
- Troubleshooting Guide — Diagnose and fix common problems: missing data, wrong prices, write failures, battery behaviour
- Quality Checks — Static quality tools and CI configuration