data: Eastern generation update 2017-2020#115
Merged
danielolsen merged 3 commits intodevelopfrom Mar 19, 2020
Merged
Conversation
BainanXia
approved these changes
Mar 19, 2020
Collaborator
BainanXia
left a comment
There was a problem hiding this comment.
Thanks for the details, which help a lot. The changes in files are consistent with the logic that explains.
90ad89d to
af9a95a
Compare
Merged
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
This data update adds wind, solar, and natural gas generators that have been added to the Eastern grid since 2016. Data comes from EIA Form 860, filtering on the operating year (>=2017).
For solar plants, we added 58 generators representing 50% of the total added capacity. All solar farms 50 MW or larger are sited. These generators were placed at buses with voltages 69-161 kV.
For wind generators, we added 42 generators representing 76% of the total added capacity. All wind farms 150 MW or larger are sited. These generators were placed at buses with voltages 69-161 kV.
For gas generators, we added 95 generators representing 88% of total added capacity. All generating units >330 MW are sited, plus any generating units part of a larger plant (same location) that are individually 200 MW or more. These generators were placed at buses with voltages 230-500 kV. This higher voltage is to ensure that these larger generators are able to push their rated power to the bulk grid, which I believe is more representative of big generating plants with high capacity factors than it is for wind and solar plants.
Notes from @danlivengood summarizing our process, with some light elaboration by me.
Summary numbers: