Final audited outcome
The 500M-per-size N=185/265 target is complete and canonical under PR #108. A later contract audit materially changes how the matching-even part must be interpreted.
Matching-odd DeltaM — prospective pass
N=185 DeltaM = +1.36830e-4 +/- 3.42352e-5
N=265 DeltaM = +1.27110e-4 +/- 3.46783e-5
x=21/4 H4: chi2 = 3.04598 / 2
zero: chi2 = 29.40938 / 2
x=17/4: chi2 = 30.24613 / 2
The matching-odd H4-like radial law survives genuinely new geometries and clearly beats zero and the predeclared x=17/4 adversary.
Registered DeltaS score — artifact contract failure
The immutable pre-target artifact used the P31 either/even source amplitude and predicted positive N^-1 target means. The threshold-rank production metadata and scorer, however, reconstruct rank-2 cross/even:
source in prediction artifact: either/even
target production channel: rank-2 cross wrapping
target scorer: S_cross=(R_G^cross+R_hat^cross)/2
The original registered positive score therefore fails numerically:
registered positive DeltaS: chi2 = 240.24721 / 2
zero: chi2 = 112.53891 / 2
That historical score remains frozen and must not be rewritten.
But P31 already contains both channels and verifies the exact orientation-difference channel map
DeltaS_cross = -DeltaS_either.
Applying only that pre-existing exact map to the frozen source means, with zero target refits, gives
corrected cross means:
N=185 -6.7521637459e-5
N=265 -6.8919446970e-5
observed cross DeltaS:
N=185 -6.0815376233e-5
N=265 -7.0249507845e-5
protocol-repair chi2 = 0.57003 / 2
marginal residual z = +0.667, -0.119
This is recorded in analysis/channel_map_corrected_DeltaS.json. It is a post-reveal protocol correction, not a retroactive preregistered pass. The right conclusion is that the registered source/target channel contract was mismatched; the 240/2 failure is not evidence that the physical cross/even N^-1 sector is falsified.
Intrinsic-center P48 score from the same new geometries
A separate no-refit score uses the original N=65/85/130 P48 amplitudes and the independent N=185/265 intrinsic-center targets:
P4[S] ~ N^-1: chi2 = 1.139 / 2
P4[D] ~ N^-13/8: chi2 = 0.281 / 2
P4[D'] ~ N^-5/8: chi2 = 0.088 / 2
P4[S'] ~ N^-5/4: chi2 = 52.716 / 2
Thus S, D and D-prime pure laws survive prospectively; S-prime is the unique clear pure-law failure and requires the already-frozen correction program.
Consequence
Do not rerun N=185/265. The useful conclusions are already sharp:
- strong prospective support for the matching-odd H4-like law;
- matching-even registered DeltaS artifact had a source/target channel bug, with a successful lower-status exact-map repair diagnostic;
- intrinsic-center P48 parity pattern survives in S, D and D-prime;
- S-prime is nonzero but needs finite-size correction.
Next high-information data remain #57 norm-5 and #50 third full-curve lineage. #48 owns the S-prime correction / channel-coordinate reconciliation, using existing data first.
Final audited outcome
The 500M-per-size N=185/265 target is complete and canonical under PR #108. A later contract audit materially changes how the matching-even part must be interpreted.
Matching-odd DeltaM — prospective pass
The matching-odd H4-like radial law survives genuinely new geometries and clearly beats zero and the predeclared x=17/4 adversary.
Registered DeltaS score — artifact contract failure
The immutable pre-target artifact used the P31
either/evensource amplitude and predicted positive N^-1 target means. The threshold-rank production metadata and scorer, however, reconstruct rank-2cross/even:The original registered positive score therefore fails numerically:
That historical score remains frozen and must not be rewritten.
But P31 already contains both channels and verifies the exact orientation-difference channel map
Applying only that pre-existing exact map to the frozen source means, with zero target refits, gives
This is recorded in
analysis/channel_map_corrected_DeltaS.json. It is a post-reveal protocol correction, not a retroactive preregistered pass. The right conclusion is that the registered source/target channel contract was mismatched; the240/2failure is not evidence that the physical cross/even N^-1 sector is falsified.Intrinsic-center P48 score from the same new geometries
A separate no-refit score uses the original N=65/85/130 P48 amplitudes and the independent N=185/265 intrinsic-center targets:
Thus S, D and D-prime pure laws survive prospectively; S-prime is the unique clear pure-law failure and requires the already-frozen correction program.
Consequence
Do not rerun N=185/265. The useful conclusions are already sharp:
Next high-information data remain #57 norm-5 and #50 third full-curve lineage. #48 owns the S-prime correction / channel-coordinate reconciliation, using existing data first.